BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in St Clr Shores, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000317575 Question Deadline 05/25/2023 at 2:00 PM ET Questions are submitted online No Rehabilitation of an existing RTB/CSO outfall including sheeting, excavation, new outfall structure, and other appurtenances. General Requirements - Insurance Required - License Required - Local Service Required - Prevailing Wage Required Contact Information Steven Wagner 586-469-6134 steven.wagner@macombgov.org The Chapaton RTB Canal Rehabilitation Project includes the following major work items: - Site clearing, excavation, haul out, and installation of sheet pile to expand the Chapaton RTB Canal. - Installation of a 6-foot-high precast concrete screen wall. - Construction of a new canal gate structure with new control building and associated appurtenances. - Construction of a concrete bypass box culvert with slide gate and stop logs. - Furnish and installation of new weir gates, slide gates, valves, piping, and associated electrical and instrumentation. - Demolition of existing gate structure and control building. - New concrete screening structure at the Chapaton RTB outfall. - New flushing gates installed in the Chapaton RTB Basin easterly weir wall. - 9 Mile Road sewer separation and road replacement. - Site restoration and landscaping. CONTRACTOR shall submit plan to ENGINEER for approval, prior to beginning Work, for maintaining service of the existing gate structure and existing gate control building and Chapaton RTB and facilities in accordance with construction project constraints detailed in Part 3 - Execution - 3.01 Project Constraints. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Wade Trim Associates, Inc. - John Arvai -Senior Vice President- jarvai@wadetrim.com

Post-Bid

Water / Sewer

$1,000,000.00

Public - County

Site Work

108

32

24

8

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
180
Bidding Soon
2,706
All Active Projects
1,112
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

July 31, 2023

July 30, 2025

img_map_placeholder

To Be Determined, St Clr Shores, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.