BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2023 at 8:00 PM

Updated May 15, 2025

Site work for a mixed-use development in Denison, Texas. Completed plans call for site work for a educational facility.

The Owner will contract directly with a Construction Manager at Risk (CMR) for performing construction management for the project. The CMR will then conduct the subcontractor selection/bidding and contract with all other subcontractors required for the work. The Owner reserves the right to contract separately with other suppliers, vendors and contracts as he deems in the best interest of their project. The CMR will be reimbursed for the cost of the Work plus a Fee. For purposes of this proposal, terms of the contract will be the AIA Document A133-2009 with the AIA-201-2017 General Conditions of the Contract for Construction with revisions. All contracts should be read carefully for district requirements. Candidates should identify in their proposal any exceptions taken or additions/modifications requested that are considered by the Contractor to be mandatory as conditions of their proposal. Objections to the contract type or format not included within the proposal submission will result in immediate disqualification of proposal. The CMR will participate in pre-construction services by preparing construction cost estimates and construction phasing scheduling assistance as identified in the Pre -Construction Services section below. The CMR competitively bids and enters into subcontracts for all portions of the work, with the exception of work specifically approved by the Owner when appropriate to schedule or logistics. Any potential self-performed work will still be competitively bid by the CMR when reasonable and possible. All subcontract bids are reviewed and approved by the Owner prior to award. Bidding shall be to at least three subcontractors for each trade, unless circumstances preclude or are not appropriate to the project. Payment and performance bonds will be required of the CMR. The Owner will make all construction payments directly to the CMR for their distribution of payments to subcontractors and suppliers as appropriate. The Owner may elect to procure certain materials/equipment directly, with coordination and scheduling support from the CMR. The equipment would then be assigned to the CMR for their full acceptance of responsibilities for coordination and installation. A specific fee for this approach is requested, should the Owner elect to do so for any materials/equipment.

Award

Educational

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
151
Bidding Soon
3,636
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

September 4, 2023

Project location map

1201 S Rusk Ave, Denison, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.