BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a municipal facility in Beaufort, South Carolina. Completed plans call for site work for a municipal facility.

Beaufort County desires to remove and replace a trench drain system along the back side (east) of the existing Charles Lind Brown Recreation Center. The plan involves the demolition of an existing trench drain, concrete apron, and chain link fence, followed by the placement of a larger trench drain tied into the existing outlet pipe, regrading of the concrete apron, and reinstallation of the fence. Work on the trench drain along the separate pool house is NOT included. The associated plans include specifications for this work in addition to an extensive interior remodel and roof replacement. All work to the building itself is NOT part of this contract. Those applicable plan set items can be ignored. The construction zone must be protected from the public and their use of the building and pool. The contractor is responsible for adequate job site fencing and access control. Emergency exits must be maintained at all times, while the non-emergency use of the exits can be controlled. Unforeseen conditions on the site that might arise in subsurface investigation can be addressed by change order. If a reasonable price cannot be determined, the County shall require the work be done on a time and materials plus profit cost method. SUBMIT QUESTIONS TO: Vendor Registry

Bid Results

Municipal

$445,000.00

Public - County

Site Work

13

6

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
40
Bidding Soon
518
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

June 19, 2023

img_map_placeholder

1001 Hamar St, Beaufort, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.