BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition for a municipal facility in Dillon, South Carolina. Completed plans call for the demolition of a municipal facility.

City of Dillon requesting separate sealed bids for complete demolition and disposal of three (3) commercial buildings and sixteen (16) residential structures with possible Asbestos Containing Material. The contractor will be responsible for demolition, removal, and proper disposal of structures and contents of existing vacant buildings. The list of structures to be demolished is included as attachment. All structures to be demolished may contain asbestos The contractor will be responsible for all costs of transport and proper disposal of all demolition debris The contactor will be responsible for all landfill fees. The contractor will be responsible for obtaining all certifications and permits necessary for completion of the project from the applicable regulatory agencies. The contractor will be responsible for demolition of all slabs and all underground structures to a depth of two feet below existing finish floor grade. Approve material shall be placed as backfill in all excavated areas and graded to the elevation necessary to provide positive surface drainage to all areas of the site. The contractor is responsible for removing all debris and trash from the entire lot, and city the lot is to be left in a clean, properly graded, ready-for-seeding state. The contractor is responsible for removing all slabs, walkways, driveways, fences, and accessory buildings. The contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. Work should begin within 30 days of award and must be completed within 90 days. Any questions regarding this solicitation must be directed to Glen Wagner via email, qwdillon@bellsouth.net

Post-Bid

Municipal

$60,000.00

Public - City

Demolition

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
61
Bidding Soon
521
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2023

June 8, 2023

img_map_placeholder

Multiple Locations, Dillon, SC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.