BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of a water / sewer project in Saluda, South Carolina. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of August 9, 2023, the project has not been awarded. A timeline for award has not been established. Contract 1 WWTP: Construction of a new 4 MGD WWTP. Contract 2 Force Main and Pump Station Modifications. The Project consists of the following: Contract 1 WWTP: Construction of a new 4 MGD wastewater treatment plant including new headworks, influent pump station, construction of a new 4 MGD SBR treatment system including new blower building, installation of new rotating disc filter, installation of UV disinfection and post aeration, effluent piping, new sludge digestion, chemical feed systems, electrical, controls, and other items required for a complete functioning project as shown on the Contract Drawings and included in the detailed specifications. Contract 2 Force Main and Pump Station Modifications: Installation of approximately 8,200 LF of 24-Inch PVC force main and all appurtenances, piping modifications at Pump Station No. 1, Pump Station No. 2, Pump Station No. 4, and Pump Station No. 5, and other items required for a complete functioning project as shown on the Contract Drawings and included in the detailed specifications. Question Deadline 05/25/2023 Information / Clarification shall be submitted in writing by Email. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Bid Results :: CONTRACT 1 WWTP :: State Utility Contractors, Inc. :: $35,486,000.00 Contract 2 - Force Main and Pump Station Modifications :: Reeves Young, LLC :: $3,599,000.00

Bid Results

Water / Sewer

$39,085,000.00

Public - County

New Construction, Site Work

143

36

66

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
85
Bidding Soon
1,213
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 15, 2023

July 3, 2023

Project location map

To Be Determined, Saluda, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.