Published September 23, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work and new construction of a military facility in Oklahoma City, Oklahoma. Completed plans call for the demolition of a military facility; for site work for a military facility; and for the construction of a 73,307-square-foot military facility.

LOCATION OF WORK/: 012-AN2 is a 75,600 SF two story building at Mike Monroney Aeronautical Center at 6301 South MacArthur Boulevard, Oklahoma City, OK 73169. of Construction: $5,000,000.00 to $10,000,000.00. Provide all labor and materials to renovate the 2nd Floor of the ANF2 Building - 012-AN2 per FAA construction and specifications provided by the FAA. Project consists of a Base only and includes: 1. Complete demolition of all existing construction, finishes, HVAC, plumbing, and electrical as indicated in the contract drawings. A small section of existing raised access floor is to be removed to allow for the restroom expansion. All other raised access floor is to remain and be protected during construction. 2. Complete renovation of the AN2 2nd floor as indicated in the contract drawings. This work shall include, but not to: a. Reconfiguration of the 2nd floor walls, doors, and associated door hardware. b. Replace all existing 2nd floor ceilings and interior finishes. c. Install interior window treatments. d. Install FAA, IBC 2015, and ANSI A117.1 compliant signage. e. Install a new duct system layout to work with the reconfigured 2nd floor.f. Replace all existing 2nd floor VAVs and controls. g. Expand the existing restrooms and replace all existing restroom plumbing fixtures and finishes as indicated in the contract drawings. Overbuilt floor shall be installed at the restroom expansion. h. Drinking fountains shall be replaced with new combo drinking/bottle filler fountains. i. Modification of the fire suppression system shall be as required to coordinate with 2nd floor reconfiguration. Electronic & IT: 03 All questions regarding the project/specifications/ must be received in writing to andre.casiano@faa.gov no later than 2:00 p.m. Central Time, Friday, July 28, 2023, to allow for responses to be provided prior to the due date for receipt of proposals. TO: Prospective offerors are recommended to attend pre-proposal conference to be held at 11:00 a.m. Central Time, Friday, July 21, 2023 via site visit at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation. All questions will be sent via to elizabeth.a.fikes@faa.gov regarding this Screening Information Request. Offerors are required to submit any questions they may have regarding this requirement in writing to the Contracting Officer by 9:00 a.m. Central Time, Friday, August 4, 2023. E-mail questions to elizabeth.a.fikes@faa.gov. Questions Continued ... *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$4,538,000.00

Public - Federal

Demolition, New Construction, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Fire-Resistant Joint Sealants, Joint Protection, Joint Sealants, Acoustical Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Facility Storm Drainage Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Flexible Connectors, Central HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
47
Bidding Soon
496
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2023

October 3, 2023

img_map_placeholder

6500 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Air Navigation Facility No. 2 (AN2) 2nd Floor Academy Buildout

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.