BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a military facility in Oklahoma City, Oklahoma. Completed plans call for the demolition of a military facility; for site work for a military facility; and for the construction of a 73,307-square-foot military facility.

LOCATION OF WORK/: 012-AN2 is a 75,600 SF two story building at Mike Monroney Aeronautical Center at 6301 South MacArthur Boulevard, Oklahoma City, OK 73169. of Construction: $5,000,000.00 to $10,000,000.00. Provide all labor and materials to renovate the 2nd Floor of the ANF2 Building - 012-AN2 per FAA construction and specifications provided by the FAA. Project consists of a Base only and includes: 1. Complete demolition of all existing construction, finishes, HVAC, plumbing, and electrical as indicated in the contract drawings. A small section of existing raised access floor is to be removed to allow for the restroom expansion. All other raised access floor is to remain and be protected during construction. 2. Complete renovation of the AN2 2nd floor as indicated in the contract drawings. This work shall include, but not to: a. Reconfiguration of the 2nd floor walls, doors, and associated door hardware. b. Replace all existing 2nd floor ceilings and interior finishes. c. Install interior window treatments. d. Install FAA, IBC 2015, and ANSI A117.1 compliant signage. e. Install a new duct system layout to work with the reconfigured 2nd floor.f. Replace all existing 2nd floor VAVs and controls. g. Expand the existing restrooms and replace all existing restroom plumbing fixtures and finishes as indicated in the contract drawings. Overbuilt floor shall be installed at the restroom expansion. h. Drinking fountains shall be replaced with new combo drinking/bottle filler fountains. i. Modification of the fire suppression system shall be as required to coordinate with 2nd floor reconfiguration. Electronic & IT: 03 All questions regarding the project/specifications/ must be received in writing to andre.casiano@faa.gov no later than 2:00 p.m. Central Time, Friday, July 28, 2023, to allow for responses to be provided prior to the due date for receipt of proposals. TO: Prospective offerors are recommended to attend pre-proposal conference to be held at 11:00 a.m. Central Time, Friday, July 21, 2023 via site visit at the Mike Monroney Aeronautical Center. The conference will be held for the purpose of site investigation. All questions will be sent via to elizabeth.a.fikes@faa.gov regarding this Screening Information Request. Offerors are required to submit any questions they may have regarding this requirement in writing to the Contracting Officer by 9:00 a.m. Central Time, Friday, August 4, 2023. E-mail questions to elizabeth.a.fikes@faa.gov. Questions Continued ... *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$4,538,000.00

Public - Federal

Demolition, New Construction, Site Work

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
44
Bidding Soon
697
All Active Projects
296
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 15, 2023

October 3, 2023

October 1, 2024

img_map_placeholder

6500 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.