Site work and renovation of a water / sewer project in Mississauga, Ontario. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

The Work of this Contract comprises general construction associated with: 1- Mobilization. 2- Staged ICP consolidation for all processes at Clarkson WWTP and GE Booth WWTP. This includes but is not limited to, - Fabrication and installation of new ICPs and CCPs. - ICP and CCP power modifications; - Relocate existing equipment and electrical conduits to suit the installation of new panels; - Network infrastructure modifications (e.g. hardware, cabling, new panels); -Retrofitting racks, backplanes, doors and complete ICPs; - Provide and install new or replacing existing HMIs/OITs; - Replacing old PLCs and rearranging I/O card configurations to meet the latest PAIDs standards; - Provide and install new ICPs to achieve new consolidated architecture; - Re-wiring of I/O within ICPs and on the field; - Re-labeling of I/O to meet the latest PAIDs standards from field device to I/O cards; - Re-tagging of field devices, ICPs and CCPs to meet PAIDs standards. - Modifying, adding or removing existing ICPs for low voltage starter usage; - Provide loop drawings for all ICPs based on the Agency standard design requirements; - Test and verify I/O before work is conducted; - Retain Alfa Laval Canada as a sub-Vendor to engineer, design and commission a ControlLogix Decanter control system replacement for each of the three (3) Centrifuges at Clarkson Biosolids Building and nine (9) centrifuges at GE Booth Biosolids Handling Building. The scope of work includes but it is not limited to: - Remove the proprietary Decanter controller and Anybus communications from the listed Centrifuges. - Produce drawings and electrical schematics for the modifications required to retrofit the current ICPs. - Customize software to adapt to Agency's standards. - Work with Vendor and Agency's SCADA Engineer to coordinate the work between individual ICP and Master Controller for centrifuges in the area to achieve Agency's desired controls architecture. - Retain Waterloo Manufacturing Company Limited as a sub-Vendor to replace controls system for three (3) Boilers at Clarkson WWTP. The scope of work includes, but is not limited to: - Remove existing control system. - Install new controls panels, transmitters and devices including O2 sensors and VFD. - Commissioning of new controls systems. - Work with Vendor and Agency's SCADA Engineer to coordinate communications between Boilers and new Master Control Panel (to be provided by Vendor as part of this scope of work). - TSSA and ESA Inspection Fees. - Provide and install new selector switches for AUMA actuators. Documents can be obtained at: https://peelregion.bidsandtenders.ca Question Deadline: Mon May 22, 2023 12:00:00 PM (EDT)

Award

Water / Sewer

$18,081,789.00

Public - County

Renovation, Site Work

419

81

34

11

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
137
Bidding Soon
2,504
All Active Projects
1,028
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

June 30, 2023

img_map_placeholder

Multiple Locations, Mississauga, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.