BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hughson, California. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

If you have any questions, please contact Bill Newlin at 209-617-7850 or Jose Vasquez at 209-505-3049. Project Scope: 1) There is approximately 1450' of 6' wide walkway and (6) 10' X 20' wheelchair parking areas. 2) The concrete for this scope is to be 4" thick and a minimum of 5 sack mix. 3) The contractor shall be responsible for measuring the length and including it in their quote. There will be no change orders due to under bidding the length of work. 4) All walkways will be 6' wide and will meet ADA specifications for slope, both lengthwise and sideways. All transitions shall meet ADA specifications. 5) The sidewalk may need to be diverted around existing obstacles. Any additional length created by these diversions shall be included in the contractor's quote. 6) All concrete will be finished with a light broom finish. 7) The sidewalk shall be joined with the Starn Park walkway at the Northwest corner. 8) The contractor shall schedule each day's work so that all pours are complete, finishing and all. Prep for the next day's pour is at the discretion of the contractor. The contractor shall be responsible for the protection of each day's pour and remaining forms through the night or weekend. 9) The contractor shall be responsible for hauling any spoils away from the site and properly disposing of them. 10) The contractor shall do their best not to damage any water or irrigation systems. If such damage occurs, the contractor shall immediately contact the City and coordinate the repairs. 11) The contractor shall be responsible for inflicting as little damage as possible to the grass areas. These areas will be impossible to avoid accessing the concrete run. Any major divots or tracks will need to be back filled after work is complete. 12) The contractor shall be responsible to provide all materials, labor and equipment needed to complete this scope. 13) The contractor understands that all "on-site" labor will be done at prevailing wage rates. The quote must reflect the most recent prevailing wage determination or as amended from time to time: 14) The contractor shall be responsible for the proper disposal of any project waste. 15) The contractor shall be responsible for the protection of any materials or equipment left on site during non-working hours. 16) The contractor shall be responsible for any required building permits and inspections. Permit fees will be waived by the City. 17) The contractor is responsible for any required USA surveys. Any damage, because of not getting a survey, will be the contractor's sole responsibility. 18) The contractor shall provide their DIR number, proof of insurance and W-9 per City requirements. 19) According to contracting law, the contractor shall provide payment and performance bonds on work totaling $25k or more

Award

Sidewalks / Parking Lot

$123,018.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
317
Active Projects
157
Bidding Soon
2,675
All Active Projects
1,144
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 10, 2023

June 9, 2023

img_map_placeholder

Charles St. and Fox Rd., Hughson, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.