Published July 18, 2025 at 8:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Maple Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of July 18, 2025, project is under construction, with completion expected Fall 2025. Maple Grove Parkway and CSAH 81 Improvements Description: Approximate quantities include: 2,500 L F Remove Sewer Pipe (Storm) 7,100 L F Remove Curb and Gutter 19,650 S Y Remove Bituminous Pavement 27,650 C Y Excavation – Common (P) 19,250 C Y Excavation – Subgrade (P) 18,200 C Y Select Granular Embankment (P) 12,000 C Y Common Embankment (CV) (P) 7,650 C Y Aggregate Base (CV) Class 6 1,600 TON Type SP 9.5 Wearing Course Mix (4,F) 860 TON Type SP 9.5 Non Wear Course Mix (4,B) 2,650 TON Type SP 12.5 Wearing Course Mix (3,C) 1,900 TON Type SP 12.5 Non Wear Course Mix (3,C) 3,450 L F 12” – 42” RCP Storm Sewer 12,500 S F 4” – 6” Concrete Walk 30,700 S F 3” Bituminous Walk 3,950 L F Concrete Curb and Gutter Design B424 750 L F Concrete Curb and Gutter Design B618 5,450 L F Concrete Curb and Gutter Design B624 1 SYS Traffic Control Signal System A 1 SYS Revise Signal System B 1 SYS Temporary Signal System A Together with drainage structures, erosion control, traffic control, and related appurtenances. The City Council reserves the right to reject any and all Bids and to waive any Bids received without explanation.

Under Construction

Roads / Highways

$4,756,311.00

Public - City

Paving, Site Work

245

16

47

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
145
Bidding Soon
1,568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

April 21, 2025

Project location map

County Rd 81 & Maple Grove Pkwy, Maple Grove, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.