BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2024 at 7:00 PM

Updated February 7, 2024

Site work for a municipal facility in Canton, Massachusetts. Completed plans call for site work for a municipal facility.

As of February 6 2024, construction of this project has been completed, however, information regarding the awarded contractor and an exact timeline for construction have not been confirmed. The project consists of: demolish and replace (2) exterior Metal stairs at building 9 as shown in the contract Documents. Units shall be vacant before existing means of egress Stair is demolished, coordinate with housing authority To ensure unit is vacant prior to demolition of stair. At No time will an emergency egress be eliminated within an Occupied unit. All egress demolition and new stair replacement will be Performed within 1 day for each unit to eliminate Disruptions of the unit. By end of each day, each unit Where work is happening shall be made safe and Operable with full capacity of egress.

Occupancy

Municipal

$45,750.00

Public - City

Site Work

10

11

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
248
Bidding Soon
3,717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.