BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Sumner, Washington. Working plans call for site work for a bridge / tunnel.

As of March 14, 2024, an engineer has been selected and this project is in the final planning phase. The City is working through the final pieces of ROW before putting the project out to bid to secure a contractor, which is anticipated in Fall 2024. Engineer firm information and a firm timeline for start of construction has not been determined. This project will replace existing 2-lane bridge with a new 74-foot wide bridge with two unequal length spans. The new structure will accommodate 4 vehicle lanes, a sidewalk, and a trail crossing. ________________________________________________________________________ Project Name: Stewart Road Bridge Replacement Project Phase II Permit Application Number: SSD-2022-0003 Project No: PRJ-2020-0007 Location: Stewart Rd SE/8th St E from Butte Ave to 140th Ave Ct E spanning the City of Sumner, Pacific and unincorporated Pierce County, WA within Section 1 of Township 20N and Range 04E at approximately river mile 4.9 of the White River. Parcel(s) #: Work primarily occurs in ROW Description of Proposal: Proposal for Phase II of the Stewart Rd improvement and bridge replacement, consisting of the replacement of the existing two-lane bridge with a new four lane bridge with a shared use path on the north side of roadway. Adjacent intersections at Butte Ave and 140th Street Ct E will be modified to accommodate the new roadway grade and lane configuration. New bridge work will include removal of existing bridge, temporary work platforms, instillation of drilled shafts, girder placement, bridge deck construction, abutment and pier cap construction, paving and marking. In addition to the bridge work, the project will also include illumination, utility relocation, planting and revegetation, signage and walls. Phase I of this project is underway west of Butte Ave and will tie into Phase II. Applicant: Michael Kosa, Public Works, City of Sumner, 1104 Maple Street, Sumner WA 98390

Final Planning

Bridges / Tunnels

$359,100.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
27
Bidding Soon
669
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.