Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of an educational facility in Topeka, Kansas. Working plans call for the construction of a educational facility; for site work for a educational facility; and for paving for a educational facility.
Shawnee County is soliciting sealed proposals for PHASE II of the Design/Build bid # 010-23 for the design and construction of a new aquatic facility at Oakland Park, 801 NE Poplar for a fixed fee (the "Project"), per the following minimum specifications. The Shortlisted firms for this Design/Build are: 1. MCP Build consisting of Latimer Sommers & Associates & SBB Engineering 2. Carrothers Construction Co LLC with Water's Edge Aquatic Design 3. Professional Engineering Consultants PA with Lamp Rynearson, Dondlinger Construction & ATHCO PHASE II: PREQUALIFIED FIRMS SELECTED IN PHASE I ONLY 2.1 In accordance with K.S.A. 19-216f, Prequalified firms selected in Phase I shall be asked to submit a more in depth response on or before May 12, 2023 at 2:00 p.m. (CST). That response must include the following: A. Company overview: a. Philosophy Statement: Provide a statement of your firm's approach to Design- Build work and how it relates to schedule, cost control and QA/QC of your product. Describe how your corporate philosophy aligns with the County's mission statement and goals. b. Community involvement: Provide a brief description of your company history involving itself in the local communities that you are working within. Provide an overview plan on how your company will align and involve itself with our community. c. Experience in managing a construction project under the current laws of the State of Kansas. d. Experience in the following areas: i. Establishing multiple Rough Order of Magnitude Estimates. ii. Accuracy of estimates. iii. Ability to work with design team to provide accurate and meaningful direction for cost savings measures without impugning the integrity of design. B. Company Experience and references, relative to the Project: a. Furnish project information of no more than 5 Projects completed by your company that are representational projects similar in scale, complexity, schedule or type to those project types listed in the project overview portion of this proposal. Include the following: i. Project Name ii. Project Description (Including completion date.) iii. Project Type New/Remodel/Addition iv. Square Footage v. Original Construction Budget vi. Final Construction Budget vii. Cost per Square Foot viii. Project Duration ix. Architect (Contact Information to be included) x. Owner (Contact Information to be included) xi. Major obstacles that your company had to overcome for a successful completion of the project. C. Project Leadership Team: Provide a resume and organization chart for your project team for those individuals who will be assigned to the project. Their roles and responsibilities for the overall leadership of this project, for the duration of this project. For each individual furnish the following: a. Name b. Role and Responsibilities c. Experience: List the Last 5 projects that each individual has worked on, including owner contact information. d. Provide confirmation that assigned personnel will be available beginning immediately and throughout the duration of the project. D. Overview of preconstruction services. E. Overview of construction planning. F. Contractor's experience utilizing software for construction scheduling and for trade coordination. G. Proposed safety plan. H. Contractor's quality control program for pre-construction and construction phase. I. Special qualifications; unique or extraordinary skills that your team brings to this specific project. J. Experience with continuous operation requirements of the owner. K. Fees, including fees for preconstruction services, design services, fees for general conditions, fees for overhead and profit and fees for self-performed work, if any. L. Project delivery date.
Final Planning
Educational
$2,859,000.00
Public - County
New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2023
January 12, 2024
801 NE Poplar St, Topeka, KS
Related To This Project
Topeka, KS
Bid Date: Jun 27 2023
Topeka, KS
Bid Date: May 16 2023
Topeka, KS
Bid Date: May 12 2023
Topeka, KS
Bid Date: May 16 2023
Topeka, KS
Bid Date: May 19 2023
Topeka, KS
Bid Date: May 25 2023
Topeka, KS
Bid Date: May 26 2023
Topeka, KS
Bid Date: Jun 06 2023
Topeka, KS
Bid Date: May 05 2023
Topeka, KS
Bid Date: May 24 2023
Topeka, KS
--
Topeka, KS
Bid Date: Oct 28 2023
Topeka, KS
Bid Date: May 24 2023
Topeka, KS
Bid Date: Apr 26 2023
Topeka, KS
Bid Date: Apr 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.