BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Nashville, Tennessee. Contact the soliciting agency for additional information.

Questions and Inquiries August 18, 2023 Responses to Inquiries August 29, 2023 SCOPE OF SERVICES. A. The Authority is looking to seek offers from qualified firms who are certified to perform Window Washing Services including but not limited to: A. Scope Detail o The Contractor must be experienced, qualified and highly skilled to provide all labor, materials, equipment, supplies, supervision, and other resources for window cleaning services. 5 o Contractor must supply all safety-barrier ground equipment to assure the public's health, safety, and welfare. o Premises in the vicinity of the work shall be left clean. The contractor is to clean excess cleaning solution off window ledge and sills. o Work shall be done in such a manner that creates a safe working and walking situation for occupants of the building. o Work shall be done in a manner which limits disruption to building occupants and that does not compromise the security of the work of occupant. o Glass transoms, glass work in doors, fixed side doors lights, picture type windows and storm windows are to be cleaned on both the exterior and the interior. o Exterior cleaning procedures should also ensure that the wind is not blowing the cleaning solution and residue onto already cleaned glass. o Care should be taken to ensure that no metal parts of the cleaning equipment touch the glass surface and that no abrasive particles are trapped between the glass and the cleaning materials. o All water and cleaning solution residue should be wiped down dry from window gaskets, sealants and frames to avoid the potential for deterioration of these materials as the result of the cleaning process. o Glass washing shall be done with water and the necessary equipment to remove all dirt, grease or stains and shall be left dry. o All chemical and cleaning products used by the contractor shall be approved for use by the Director of Engineering prior to commencement of the services. No equipment or supplies shall be used that could damage floors, floor coverings, woodwork, painted surface, furniture, and landscaping around the perimeter of the building. o Contractor personnel shall complete an onsite log sheet weekly of arrival location /area cleaned. Each area shall be inspected and accepted by the Director of Engineering before considered complete for payment. o Work shall be done in such a manner that creates a safe working and walking situation for occupants of the building. o The awarding Contractor shall provide within The Contractors supervisors should also be readily available to review all phases of the project when requested by the Director of Engineering. o A cleaning schedule outline for all locations shall be developed in writing (Exhibit F) by the contractor. No major deviation shall be made without prior written consent of the Music City Center. The Contractor shall also confirm that they can complete the project within the specified time frame/schedule outline proposed in Exhibit F. In the event the proposed schedule is delayed, contractor must provide an alternate project time frame (i.e. three days given in proposed schedule outline- confirming that they can complete in three days or an alternate completion time frame: i.e. it will take five days to complete).

Post-Bid

Conference / Convention Centers

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
74
Bidding Soon
1,277
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 20, 2023

October 19, 2023

Project location map

201 Rep. John Lewis Way S, Nashville, TN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.