BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Thornapple Township, Michigan. Completed plans call for paving for a road / highway; and road / highway.

The project consists of furnishing all material and constructing the following: Approximately 10,300 lineal feet of 8-foot wide HMA Shared Use Pathway Approximately 1,120 lineal feet of 10-foot Treated Timber Boardwalk Approximately 1,400 square feet of Modular Concrete Block Retaining Wall Approximately 6,000 square yards of Slope Restoration, Type A All Necessary Appurtenances Including all necessary appurtenances and restoration. The work to be performed under this contract will be financed and paid for by funds received from Caledonia Township. A bid bond, certified check, or cashier's check payable to Caledonia Township in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of forty-five (45) days after the receipt of bids. The contractor shall have The contractor shall have Sixteen (16) weeks in which to complete construction of the project between the issuance date of the Notice to Proceed and November 17, 2023. Contractor can pick the start date, however upon start of construction work must be completed within sixteen (16) weeks of his start and prior to November 17, 2023

Award

Roads / Highways

$1,920,135.00

Public - City

Paving, Site Work

17

8

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
180
Active Projects
120
Bidding Soon
1,453
All Active Projects
539
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 11, 2023

July 10, 2023

November 17, 2023

img_map_placeholder

Whitneyville Rd, Thornapple Township, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.