BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Wilmington, Delaware. Completed plans call for site work for a water / sewer project.

Sealed bids are invited for improvements to the Birch Knoll subdivision stormwater management pond. Included in the work are the rehabilitation and retrofit of the existing stormwater management pond including installing of flow channels, installing rip rap at the outfalls and forebay, stabilizing eroded areas between the outfall and stream, removal and replacement of existing corroded and failing CMP outlet pipes with reinforced concrete pipe (RCP), installation of headwalls and landscaping in accordance with the contract specifications and drawings. The work is located in the Birch Knoll subdivision in North Wilmington, Delaware. The pond is located at the junction of Birch Knoll Road and Pine Cliff Drive. Bids shall be accompanied by a bidder's bond or certified check in an amount equal to 10% of the bid price, payable to New Castle County and conditioned to be forfeited to said County for failure to enter into a contract, if awarded. Awards, if any, will be made to the lowest responsible bidder. The County reserves the right to reject any and/or all bids and to waive minor irregularities. Bidders are required to submit all Proposal pages with their bid. The Proposal must be signed and sealed. A bid bond must be included with the Proposal. Any deviation from these instructions may result in the rejection of your bid. The successful Bidder will be required to give bond of a surety company, acceptable to the County, and licensed to do business in the State of Delaware, in the amount of the contract price. Minority and Women Business Enterprises (M/WBE) will be afforded full opportunity to submit bids and will not be subject to discrimination on the basis of race, color, national origin, sex religion, age, disability, or sexual orientation in consideration of this award. The payment of prevailing wages as determined by the State of Delaware Department of Labor to all mechanics and laborers working on the project is required.

Bid Results

Water / Sewer

$310,010.00

Public - County

Site Work

13

11

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
639
Active Projects
132
Bidding Soon
4,208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

July 6, 2023

Project location map

Multiple Locations, Wilmington, DE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.