BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Saint Francis, South Dakota. Completed plans call for site work for a transportation facility.

Sealed bids will be received by the Tribal Council ofthe, Rosebud Sioux Tribe., 11 Legion Ave, South Dakota, 57570 for furnishing all equipment, labor, and materials as set forth in the specifications and performing all work, incidental thereto for Automated Weather Observing System (AWOS III-P), Rosebud Sioux Tribal Airport, Rosebud, South Dakota. Base Bid Primary Work: AWOS III-P System Complete and Commissioned, Terminal Building Work Complete, 5,320 Ft of 1/C No. 2 AWG, 600V. THWN-2 Installed in Conduit, 2,660 Ft of 1/C No. 8 AWG 600V (GNP) THWN-2 Installed in Conduit, 300 Ft ofNon-Encased Electrical Conduit 2-Inch Type I Sch 40 PVC in Trench or SDR 13 HDPE Plowed, 300 Ft ofTrenching & Backfilling or Plowing for Conduit, 1 Each Cable Marker, 2 Each L-867B (12") Class I Junction Box with Flat Blank Steel Cover, 1 Each L-810 LED, Double Airport Obstruction Light, in Place, and various other items ofrelated construction. Users who have downloaded the Plans and Specifications will be mailed an invoice of $20.00. All payments are nonrefundable. Additionally, upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy ofPlans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. Bid Guarantee: Each bid must be accompanied by a certified check, cashier's check or draft in the amount offive percent (5%) ofthe total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the Rosebud Sioux Tribe of South Dakota. Contract Bonds: Separate Payment and Performance Bonds guaranteeing faithful performance ofthe Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) ofthe amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. Commencement and Completion: The Engineer will set the beginning date in a written "Notice to Proceed with Construction". The Contractor shall begin the work within ten (10) days ofthe date set forth in the written "Notice to Proceed" and shall complete the work within the number of calendar days, working days, or completion date or dates as shown in the Specifications.

Bid Results

Transportation Terminals

$303,819.00

Public - Federal

Site Work

25

25

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
19
All Active Projects
5
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

May 26, 2023

img_map_placeholder

1506 Airport Rd, Saint Francis, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.