Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Saint Francis, South Dakota. Completed plans call for site work for a transportation facility.
Sealed bids will be received by the Tribal Council ofthe, Rosebud Sioux Tribe., 11 Legion Ave, South Dakota, 57570 for furnishing all equipment, labor, and materials as set forth in the specifications and performing all work, incidental thereto for Automated Weather Observing System (AWOS III-P), Rosebud Sioux Tribal Airport, Rosebud, South Dakota. Base Bid Primary Work: AWOS III-P System Complete and Commissioned, Terminal Building Work Complete, 5,320 Ft of 1/C No. 2 AWG, 600V. THWN-2 Installed in Conduit, 2,660 Ft of 1/C No. 8 AWG 600V (GNP) THWN-2 Installed in Conduit, 300 Ft ofNon-Encased Electrical Conduit 2-Inch Type I Sch 40 PVC in Trench or SDR 13 HDPE Plowed, 300 Ft ofTrenching & Backfilling or Plowing for Conduit, 1 Each Cable Marker, 2 Each L-867B (12") Class I Junction Box with Flat Blank Steel Cover, 1 Each L-810 LED, Double Airport Obstruction Light, in Place, and various other items ofrelated construction. Users who have downloaded the Plans and Specifications will be mailed an invoice of $20.00. All payments are nonrefundable. Additionally, upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy ofPlans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. Bid Guarantee: Each bid must be accompanied by a certified check, cashier's check or draft in the amount offive percent (5%) ofthe total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the Rosebud Sioux Tribe of South Dakota. Contract Bonds: Separate Payment and Performance Bonds guaranteeing faithful performance ofthe Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) ofthe amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. Commencement and Completion: The Engineer will set the beginning date in a written "Notice to Proceed with Construction". The Contractor shall begin the work within ten (10) days ofthe date set forth in the written "Notice to Proceed" and shall complete the work within the number of calendar days, working days, or completion date or dates as shown in the Specifications.
Bid Results
Transportation Terminals
$303,819.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2023
May 26, 2023
1506 Airport Rd, Saint Francis, SD
Related To This Project
Saint Francis, SD
Bid Date: Apr 26 2023
Saint Francis, SD
Bid Date: Jun 29 2023
Saint Francis, SD
Bid Date: Dec 19 2023
Saint Francis, SD
Bid Date: Aug 12 2024
Saint Francis, SD
Bid Date: Aug 09 2023
Saint Francis, SD
Bid Date: May 04 2022
Saint Francis, SD
--
Saint Francis, SD
Bid Date: Apr 22 2022
Rapid City, SD
--
McLaughlin, SD
Bid Date: May 07 2024
Custer, SD
Bid Date: Jan 24 2024
Custer, SD
Bid Date: Jan 03 2024
Sioux Falls, SD
Bid Date: Apr 26 2023
Deadwood, SD
Bid Date: May 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.