BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2023 at 8:00 PM

Updated March 16, 2024

Site work for a water / sewer project in West Haven-Sylvan, Oregon. Completed plans call for site work for a water / sewer project.

Please note that Addendum 1 is available. The proposed work for the Project consists of furnishing required labor, equipment, and materials for construction of the following: 1. Approximately 1,000 linear feet (lf) of 12-inch, 700 lf of 8-inch, and 120 lf of 6-inch ductile iron restrained-joint water piping with ductile iron fittings and polyethylene encasement. 2. Install via horizontal directional drilling approximately 200 lf of owner-furnished 14-inch HDPE and reducer connections. 3. One fire hydrant including ductile iron fire hydrant leads with polyethylene encasement, abandonment of existing water mains, five water service replacements, testing and special inspection, associated surface & fence restoration, clean-up, traffic control, erosion control, and incidental related work as described in the Contract Documents. 4. Engineers Estimate is $650,000 – $800,000. Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of the Tualatin Valley Water District in an amount not less than ten (10) percent of the amount bid. The successful bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents. The Owner reserves the right to reject all bids not in compliance with all prescribed public contracting procedures and requirements, including bidder responsibility under ORS 279C.375(3)(b), and may reject for good cause all bids upon the Owner’s finding that it is in the Owner’s or the public’s best interest to do so. The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible bidder. The successful Bidder must achieve Substantial Completion September 27, 2024 and Final Completion by October 31, 2024. Notice to Proceed is anticipated to be issued April 1, 2024.

Award

Water / Sewer

$697,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
87
Bidding Soon
1,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 4, 2023

April 1, 2024

Project location map

SW Barnes Rd & SW Viewmont Dr, West Haven-Sylvan, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.