BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Watersmeet, Michigan. Contact the soliciting agency for additional information.

The FS National Nursery System FMP will be used to create a dynamic and flexible interdependent nursery system. Nursery investments shall be evaluated in a holistic manner where improvements are positioned and prioritized in alignment with the reforestation need as described in the National Forest System Reforestation Strategy and Draft National Nursery System Strategic Plan (see Attachments). This includes right-sizing existing and proposed sites by considering reforestation needs after timber harvest, wildfire, insect & disease outbreaks, and other natural disasters. Additional considerations include eliminating reforestation and facility deferred maintenance backlog, improving seed and seedling production rates, supporting a desired scale of production and seed caching, and providing improved operational workflow at each site (including addressing personnel needs, training, and recruitment). This evaluation includes closing current gaps in the system by cross-referencing the need with existing and proposed sites, capabilities for production and distribution, and type of seed/plant produced. Consideration shall be given to sharing equipment, resources, and personnel following critical events, such as megafires or other natural disasters. The contractor shall gain a thorough understanding of the process flows, facilities, and infrastructure at each of the existing sites. The PPAs and SDPs may need to be developed simultaneously or consecutively depending on the site. Additionally, PPAs and SDPs shall be prioritized considering the most appropriate method to meet future capacity demand for reforestation needs. SOWs and SDPs for the highest priority sites, as determined in conjuction with FS approval, shall be started first before starting work on lower priority sites. The method has not been determined. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$28,011,387.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
78
All Active Projects
31
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2023

img_map_placeholder

US-45, Watersmeet, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.