BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a playground / park / athletic field in Mobile, Alabama. Completed plans call for the renovation of a playground / park / athletic field.

Project Location: 900 Spring Hill Avenue, Mobile, Alabama 36604 Contact the Project Manager, Roger Washington, at the City of Mobile, Architectural Engineering Department, 251-208-7812 phone, 251-214-1488 mobile, 251-208-7894 fax or e-mail roger.washington@cityofmobile.org for further clarification regarding this Request for Quotes. Summary of Work: Include providing all labor, supplies, tools, and equipment required to dry grind, repair, and polish the monument's granite panels in order to create a plan that will allow water to flow across the granite surface evenly with the least amount of splashing possible at the surface seams. The contractor is also required to repair the exterior fountain walls in accordance with the specifications in this RFQ document. The Contractor shall use the appropriate dry grinding tools to evenly grind the surface of the four bottom granite panels so that the bottom panels are on the same plane as the four upper granite panels. The Contractor is to remove all of the delaminated precast concrete panels from the fountain wall's base. The Contractor shall remove the existing mastic from rear of concrete panels and wall substrate, clean and prep to be reapplication. o The Contractor is to wash the substrate to remove any loose dirt and debris, creating a clean bonding surface for the concrete veneer panels to adhere. Contractor shall coordinate inspection of wall with project manager after cleaning substrate. o The contractor shall install the concrete veneer panels to the fountain wall, while wall is still damp, using Type S mortar mix, per the manufacturer's instruction. Concrete veneer panel shall installed at same height, spacing and depth as the adjacent panels. Panels shall be braced in place for 24 hours or until mortar mix has set. Excess mortar shall be cleaned from joints and brushed from surfaces using a wire brush and whiskbroom. o Existing mortar joints shall be removed to a depth of 3/4 ". Contractor shall then wash down the wall to remove any loose mortar debris that is remaining. Contractor shall re-grout joints using mortar mix using Type S mortar mix. Contractor shall soft wash the entire fountain base, monument and monument base, per City of Mobile Examination of Documents: Before submitting a Quote, Contractors shall carefully examine this RFQ (including attachments), visit the site (including recommended attendance at the Pre-Quote meeting), fully inform themselves as to existing conditions and limitations, and include in the Quote a sum to cover the cost of all items included in the RFQ and as necessary to perform the work. The submission of a Quote will be considered as conclusive evidence that the Contractor has made such examination. All Requests for Information (RFI's) and requests for substitutions shall be submitted in writing to the Project Manager no later than 3:00 PM, five (5) business days prior to the Quote submittal date Bond Requirements: For contracts that exceed $50,000.00, a Bid Bond (or Bid Security), Performance Bond and a Labor and Material Payment Bond shall be required. A. Cost of Bonds shall be included in the Contractor's bid. B. A Surety authorized to do business in the State of Alabama must issue Bonds. C. The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of the power of attorney. Bid Security/Bid Bond: A. A Cashier's Check drawn on an Alabama bank or Bid Bond payable to Owner, City of Mobile, in the amount of 5% of the Base Bid, but in no event more than $10,000.00 is required to accompany Bid. B. The Bid Security of the three lowest bidding Contractors shall be retained by the Owner until a contract is executed for the project. A City of Mobile Business License is required and must be current at contract execution and throughout duration of contract. Within ten (10) calendar days from the date of issuance of Contract forms for execution, the Contractor shall deliver to the City of Mobile the following items along with the electronically signed Owner Contractor Agreement: 1. Proof of enrollment in the Federal E-Verify program (see sample document attached as Exhibit 1) 2. Contract form example "Agreement Between Owner and Contractor For A Stipulated Sum" (sample attached as Exhibit 2) 3. Certificate of Insurance and policy endorsements in accordance with City of Mobile Insurance Requirements (attached as Exhibit 3 with sample documents) Project Location: 900 Spring Hill Avenue, Mobile, Alabama 36604

Award

Playgrounds / Parks / Athletic Fields

$44,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
34
Bidding Soon
490
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 9, 2023

img_map_placeholder

900 SpringHill Ave, Mobile, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.