BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Diablo, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Assembly member Bauer-Kahan worked with the California Department of Parks and Recreation to allocate $238,000 for the engineering design work associated with the pathway project. This project will provide a new protected route for pedestrians and cyclists to use when traveling between Mount Diablo Boulevard and Stanley Boulevard / Deer Hill Road. The project will close a multi-use pathway gap between northeast, central and southern Lafayette by providing a continuous bikeway network via Pleasant Hill Road that connects to the East Bay Regional Park District's Lafayette- Moraga Regional Trail. The pathway will connect Acalanes High School, Lafayette Elementary School, Stanley Middle School, and Saint Mary's College via a continuous multi-use pathway. The pathway is designed to be constructed in the center of Pleasant Hill Road to eliminate the need for pedestrians and bicyclists to cross State Route 24 on-ramps and off-ramps. The pathway will be 14 feet wide and separated from vehicle traffic by vertical concrete barriers on either side. In locations where additional width is available, landscaping will be added between the pathway and the traffic barriers. In order to accommodate this design, the parking on Pleasant Hill Road between Mount Diablo Boulevard and Stanley Boulevard / Deer Hill Road will be eliminated. In addition, the existing dedicated northbound right turn at the Shell gas station from Pleasant Hill Road to Stanley Boulevard will be eliminated. The method of Contractor Selection has not been Determined at this time.

Final Planning

Roads / Highways

$3,500,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
477
Active Projects
207
Bidding Soon
2,504
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.