BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

The work consists of rehabilitation of approximately 2,018 feet of existing 36- and 42-inch diameter reinforced concrete pipe (RCP) with cured-in-place pipe (CIPP) liners. The project also includes rehabilitation of six (6) existing manholes with a protective coating system, and all appurtenant work. Working Days: 160 Award: 6/14/2023 Dollar Range: Approx. $1,200,000-$1,800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Section covers the prevailing wage rates determined by the Director of the Department of Industrial Relations of the State of California and other labor practices. This Section supersedes Sections 5-3.2 through 5-3.5 of the Standard Specifications. 1.6.2 General Pursuant to applicable provisionsof theLabor Code of theState ofCalifornia, not lessthan the general prevailing rate of per diem wages and not less than the general prevailing rate of per diem wages for legal holiday and overtime work for each craft or type of worker needed to execute the work contemplated under this Contract, as ascertained by the Director of the Department of Industrial Relations, shall be paid to all workers employed on said Work by the Contractor or by any subcontractor doing or contracting to do any part of said Work.

Award

Water / Sewer

$2,073,651.00

Public - County

Site Work

33

3

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
95
Bidding Soon
2,235
All Active Projects
992
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

September 4, 2023

img_map_placeholder

Multiple Locations, Whittier, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.