Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Greenville, Mississippi. Completed plans call for the renovation of a educational facility.
Bid proposals must be submitted, in duplicate, on copies of the General Construction Bid Form included in the specifications and must be accompanied by a Bid Bond, Certified Check, or cash in the amount of 5% of the Base Bid (100%). The Bid Bond, if used, shall be payable to the Owner. Performance and Payment Bond will be required from the successful bidder. Bids are requested for a Lump Sum Base Bid with any Alternates and/or Unit Costs requested. In the event that an electronic bid is submitted, a copy of the bid bond must be included with the submission. If submitting electronically, a hard copy of all bid documents must be provided within 3 business days if requested after the bid opening. For sealed bids, the current Certificate of Responsibility Number of the bidder shall appear on the outside of each sealed envelope containing a proposal, said envelope being plainly marked Greenville Schools Roof Replacement. If submitting electronically, please include this information on a cover page with your bid submission. Each electronically submitted bid must be submitted in pdf format and shall contain the same information and forms as required for the paper bids. Note - electronic bids must be secured with a bid bond. In the event that an electronically submitted bid has a corrupted attachment, the bid will be considered null and void. Questions regarding website registration and online orders please contact Plan House at 662-407-0193. For questions related to the contract documents, contact Shafer Zahner Zahner at 662-323-1628. All bids submitted in excess of $50,000.00 by a Prime or Sub-Contractor to do any erection, building, construction, repair, maintenance, or related work must comply with the Mississippi Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of Public Contracts. If a bidder submits a bid not exceeding $50,000, no Certificate of Responsibility number is required; however, a notation stating that the bid does not exceed $50,000 must appear on the face of the envelope, or a Certificate of Responsibility number. Each bidder submitting a bid in excess of $50,000 must show its Certificate of Responsibility number on the face of the envelope containing the bid. If submitting electronically, please include this information on a cover page with your bid submission. The Contract will be awarded to the lowest and best bidder, except the Owner reserves the right to reject any and all bids and to waive any informality whenever rejection of waiver is in the best interest of the Owner. The Owner also reserves the right to negotiate with the lowest bidder for any deletions or additions to the contract, as they desire. The base bid portion and all accepted alternates shall be substantially complete within 180 consecutive calendar days from the date of issuance of the "proceed order” and shall reach "final completion” with all Punch List items complete within 7 consecutive calendar days after the date of Substantial Completion. Bid Result : Independent Roofing Systems, Inc - Modified Bitumen: $ 916,200.00 TPO: $ 781,295.00
Under Construction
Educational
$1,697,495.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2023
June 15, 2023
Multiple Locations, Greenville, MS
Related To This Project
Greenville, MS
Bid Date: Sep 12 2023
Greenville, MS
Bid Date: Mar 17 2021
Greenville, MS
Bid Date: May 19 2023
Greenville, MS
Bid Date: Aug 10 2021
Greenville, MS
Bid Date: Mar 04 2020
Greenville, MS
Bid Date: Feb 21 2019
Greenville, MS
Bid Date: Jun 13 2019
Greenville, MS
Bid Date: Apr 02 2019
Greenville, MS
--
Greenville, MS
Bid Date: Apr 27 2023
Greenville, MS
Bid Date: Jun 22 2022
Greenville, MS
Bid Date: Mar 28 2023
Greenville, MS
Bid Date: Mar 08 2023
Greenville, MS
Bid Date: Mar 02 2023
Greenville, MS
Bid Date: Mar 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.