Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Site work for a civil project in Santee, California. Design plans call for site work for a water / sewer project.
The existing Blossom Valley Reservoir (BV), owned and operated by the District, is a 7.9 million gallon (MG) drinking water storage facility that was constructed in the early 1960s and consists of a compacted fill embankment, concrete liner, and wooden roof with concrete column supports. As a result of water demands decreasing approximately 40 percent since 2007, District water system operators have only been utilizing a portion of the overall storage volume (approximately 30 percent) of the reservoir since 2014. The Blossom Valley Reservoir Replacement Project will assist the District in achieving its strategic goals by replacing the existing reservoir with a 3.25 MG reservoir. Padre Dam's primary potable water transmission main uses water from the Blossom Valley Reservoir to feed Padre Dams Eastern Service Area. This backbone system pipeline was constructed in the early 1960's and consists of a combination of pipe materials including lock-bar steel, cement mortar lined and coated steel, and concrete cylinder pipe ranging in diameter from 16 to 36 inches. In 1964, segments of Interstate 8 were built, and the alignment of the new Interstate was constructed over portions of the existing backbone pipeline. Two of those locations are Labrador Lane, which is the focus of the I-8 Unencased Transmission Main Replacement Project (I-8), and Dunbar Lane. These crossings beneath Interstate 8 have been identified for replacement due to its criticality and position which makes them difficult to access, inspect, maintain, or repair. As of July 8, 2025, further details regarding firm construction and completion timelines have not been released.
Design
Water / Sewer
$32,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2023
December 1, 2025
Multiple Locations, Santee, CA
Related To This Project
Santee, CA
Bid Date: Mar 31 2021
Santee, CA
Bid Date: May 19 2023
Santee, CA
Bid Date: Jan 09 2025
Santee, CA
Bid Date: May 10 2023
Santee, CA
Bid Date: Jun 02 2023
Santee, CA
Bid Date: May 03 2023
Santee, CA
Bid Date: Apr 26 2023
Santee, CA
Bid Date: Oct 26 2023
Santee, CA
Bid Date: Apr 06 2023
Santee, CA
Bid Date: Feb 28 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
