Site work and paving for a mixed-use development in Highland Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work consists of hot-mix-asphalt surface removal and replacement with Warm Mix Asphalt surface, construction of concrete flat curb (bordering the pavement), construction of concrete paver parking, new roadway lighting, new fire hydrants, drainage improvements, sidewalk improvements, seeding and topsoil, landscape improvements, and all incidental and collateral work necessary to complete the project as shown on the plans and specifications. Bidders must be on the plan holders list through QuestCDN for bids to be accepted. To access the electronic bid form, download the project documents and click the online bidding button. The City reserves the right to accept or reject any or all bids. The successful Bidder shall be required to furnish certificates and policies of insurance as required by the Contract. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). Contractors must provide Certified Monthly Payroll Reports. It is the responsibility of the bidder to inspect the entire bid package and seek clarification of any item which may not be clear to them. For questions, contact Emmanuel Gomez, City Engineer at 847.926.1145 or Bianca Ramirez, Contract Specialist at 847.926.1189. If you have questions pertaining to this summary report, or if Rubino may be of further service, please contact our office at (847) 931-1555.

Award

Roads / Highways

$1,581,818.00

Public - City

Paving, Site Work

51

12

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Cleaning and Waste Management, Closeout Submittals, Bonds, Commissioning
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
143
Bidding Soon
2,484
All Active Projects
1,036
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

June 12, 2023

img_map_placeholder

Multiple Locations, Highland Park, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Briergate Business District Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.