BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a transportation facility in Orlando, Florida. Completed plans call for the renovation of a transportation facility.

Replacement and installation of 2 electronic gates at Orlando Executive Airport. Remove two Hysecurity SlideDriver gate operators and two 7' x 14' chain link cantilever gates. Install two new Hysecurity Operators, model SlideDriver 15, part # HY-222 SS ST, and two cantilever gates with all necessary hardware and control devices for a fully functioning system. Vendor can salvage any old parts that are still serviceable. Awarded vendor must be a Manufacturer Authorized Installer 1) Performance of services specified in this RFQ do not require that the Vendors' employees have airport access badges Deadline for Questions: 5:00 PM EST on Thursday, May 4, 2023

Bid Results

Transportation Terminals

$43,664.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
149
Bidding Soon
2,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.