BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Pittsburgh, Pennsylvania. Conceptual plans call for site work for a playground / park / athletic field.

The City of Pittsburgh Office of Management and Budget, on behalf of the Department of Public Works (DPW), is requesting proposals from qualified consultants to provide Construction Management (CM) services for the redevelopment of Homewood Park located at 540 N Lang Ave, Pittsburgh, PA 15221. The City of Pittsburgh is requesting a proposal to provide Construction Management (CM) services for Homewood Park Construction in the Homewood South neighborhood. In 2015, Homewood Community Sports (HCS), with the help of Heinz Endowments, Operation Better Block, Neighborhood Allies, Bridging the Gap Development, and The Mission Continues began a grassroots level study of field improvements at Willie Stargell Field. The study identified some of the challenges that the site faces with the existing conditions. Currently, the field serves both as a baseball and football field; however, the field is inadequately sized for both sports. HCS led an extensive community engagement process in order to develop a Master Plan for the existing Stargell Field and expansion of Homewood Park onto the previous Homewood School property along Hamilton Avenue. Based on the results of the Master Plan, the City of Pittsburgh's Department of Public Works, along with these essential community partners and a landscape architecture consultant, have designed the following improvements: Site engineering for the development of a regulation-size football and relocated baseball field*, seating and site-wide ADA accessibility Structural engineering for retaining walls surrounding the site and elevation changes to better connect the field to the street level while avoiding groundwater issues. Relocation of existing pool and bathhouse/locker room to accommodate field renovations Site-wide stormwater management solutions Connection to the Martin Luther King Jr. Busway Cultural/performance space with connections to the Afro American Music Institute Installation of new playground The scope of work also includes the relocation of a stand-alone baseball field to an off-site location. Please note that work associated with this field will NOT be included as part of the scope of work for this CM services request.

Conceptual

Playgrounds / Parks / Athletic Fields

$2,250,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
36
Bidding Soon
790
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.