BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Clinton Corners, New York. Completed plans call for the renovation of a municipal facility.

All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $500,000 and $1,000,000 for H, and between $100,000 and $250,000 for E. The Office of General Services reserves the right to reject any or all bids. For all other questions, please send an email to DCPlans@ogs.ny.gov. The substantial completion date for this project is 209 days after the Agreement is approved by the Comptroller. MBE Goals: E Trade: 0% H Trade: 15% WBE Goals: E Trade: 0% H Trade: 15% SDVOB Goals: E Trade: 3% H Trade: 3% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For questions about downloading of bid documents, please send an e-mail to support@bidexpress.com, or call the Bid Express toll-free number at (888) 352-2439. For all other questions, please send an email to DCPlans@ogs.ny.gov, or call (518) 474-0203. The purpose of this project was to conduct a pre-renovation hazardous materials survey for asbestos, lead-based paint (LBP), and polychlorinated biphenyls (PCB) at 1631 Hollow Road, Clinton Corners, NY (The Site). The areas inspected were limited to the interior and exterior of the building only in areas expected to be impacted by the proposed HVAC Upgrades. No roof samples were taken as it was reported that the roof is being replaced under a separate contract. Ambient Environmental, Inc. (Ambient) provided the following services for Friedman Fisher Associates, P.C. (Client) in accordance with Ambient proposal number 2021-02-0072. On August 3, 2022, Ambient returned to the site to collect a sufficient amount of the red caulk on the boiler flue, in order to determine if the material contained PCBs or not. Any changes to this report of a result of this sampling are reflected in red throughout. Conduct a representative Hazardous Materials Survey in the identified building, which includes: o Survey the site building. o Identify accessible suspect asbestos-containing materials (ACMs) that were not previously tested using limited destructive means. o Quantify ACMs, including material condition and location. o Collect and analyze bulk samples of suspect friable and non-friable materials to eliminate suspect materials as asbestos containing. o Conduct a limited lead-based paint inspection of the building with a Heuresis Corporation Pb200i Lead Paint Analyzer. o Collect and analyze bulk samples of potential PCB containing window/door caulk. 2.0 EXECUTIVE SUMMARY The inspection was conducted by NYS licensed and AHERA trained asbestos inspectors and trained lead inspectors. The inspection involved visual examinations and sampling of suspect materials that may be impacted by planned renovation projects. Inspection results revealed the following findings: o The renovation area does contain asbestos containing materials o The renovation area does contain lead-based paint o The renovation area does not contain PCBs in caulking o In the attic there is an asbestos incidental disturbance of pipe insulation and mudded fittings. This disturbance will require a contamination assessment and the potential development and submission of a NYS DOL Site Specific Variance to allow for the clean-up and abatement of this material by a NYS licensed and certified asbestos abatement contractor. This area should be cordoned off and not occupied by any uncertified asbestos personnel until the proper cleanup has been completed. . ELATED CONTRACTS A. The Project consists of the following separate contracts: HVAC Work Project No. 47208-H Electrical Work Project No. 47208-E B. The suffix letter at the end of the project number distinguishes the separate Contracts. The Sections in Division 01 of the Specifications which have more than one suffix letter (such as this Section) are common to each related Contract. 1.03 SUBSTANTIAL AND PHYSICAL COMPLETION DATES A. Substantially complete the Work within 209 days after the Agreement is approved by the Comptroller. 1. The time allocated for the performance of work under this contract includes 10 days for notification of the Contractor of the Comptroller's approval of the Agreement. 2. The approval of the Agreement by the Comptroller constitutes the filing of the Contract Documents as a public record and notice to the Contractor that a fully executed contract exists between the Contractor and the State. B. Physically complete the Work within 90 days after the established Substantial Completion date. 1.04 CONTRACT AWARD SUBMITTALS A. Submittal No. 1: Submit the CONTRACTOR'S LIST OF SUBCONTRACTORS-SUPPLIERS information required in SCHEDULES AND RECORDS Article in Specification Section 013000 not later than 15 days after approval of the Contract by the Comptroller. B. Submittal No. 2: Submit Preliminary Project Schedule related information noted in 013113 Project Planning and Scheduling or 013200 Construction Progress Documentation, whichever section is applicable, within 15 days after approval of the Contract by the Comptroller for review by the Director's Representative and OGS Scheduling For questions about downloading of bid documents, please send an e-mail to support@bidexpress.com, or call the Bid Express toll-free number at (888) 352-2439 Pursuant to New York State Executive Law Article 15-A and the rules and regulations promulgated thereunder, OGS is required to promote opportunities for the maximum feasible participation of New York State-certified Minority and Women-owned Business Enterprises("MWBEs") and the employment of minority group members and women in the performance of OGS contracts. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for HVAC Work. The total contract goal can be obtained by utilizing any combination of MBE and /or WBE participation for subcontracting and supplies acquired under this Contract. Trades with 0% goals are encouraged to make "good faith efforts" to promote and assist in the participation of MWBEs on the Contract for the provision of services and materials. . . .

Award

Municipal

$111,065.00

Public - State/Provincial

Renovation

30

33

12

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
191
Bidding Soon
3,087
All Active Projects
1,414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

July 18, 2023

img_map_placeholder

1631 Hollow Rd, Clinton Corners, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.