Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 9, 2025 at 7:00 PM
Updated October 1, 2024
Site work and new construction of a military facility in Fort Campbell, Kentucky. Working plans call for the construction of a 1,280-square-foot military facility.
Bid is cancelled. ***AMENDMENT 0004 - See attached document for Amendment 0004. The proposal due date has been extended until 14 January 2025 at 1:00PM Eastern Time. ------------------------------------------------------------------------- ***AMENDMENT 0002 - See attached document for Amendment 0002. The proposal due date has been extended until 12 December 2024 at 1:00PM Eastern Time. ------------------------------------------------------------------------- ***AMENDMENT 0001 - See attached document for Amendment 0001. The proposal due date has been extended until 19 November 2024 at 1:00PM Eastern Time. ------------------------------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Louisville District has issued Request for Proposal (RFP) Solicitation W912QR-24-R-0067 for the Design-Bid-Build new construction of a multi-purpose training range for Ft. Campbell. The project will construct a standard design Multipurpose Training Range (MPTR). Primary facilities include the MPTR, downrange site preparation, range operations control area (ROCA), range control tower (non-instrumented), small after-action review building, large operations/storage building, latrine, bleacher enclosure, covered mess, ammunition loading dock, bivouac area, unit staging area, and building information systems. Post Construction Award Services (PCAS) are included in this project. Supporting facilities include electric service; paving; storm drainage; site improvements; and information systems. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. *The value for this project is based on a financial range of $25,000,000 and $100,000,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Military
$100,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
July 9, 2025
To Be Determined, Fort Campbell, KY
Related To This Project
Fort Campbell, KY
Bid Date: Sep 20 2023
Fort Campbell, KY
Bid Date: May 11 2023
Fort Campbell, KY
--
Fort Campbell, KY
--
Fort Campbell, KY
Bid Date: Apr 02 2020
Fort Campbell, KY
--
Fort Campbell, KY
Bid Date: Jul 21 2023
Fort Campbell, KY
Bid Date: Aug 11 2023
Fort Campbell, KY
--
Fort Campbell, KY
Bid Date: Jun 20 2023
Fort Campbell, KY
Bid Date: Apr 14 2023
Fort Campbell, KY
Bid Date: Jul 25 2023
Fort Campbell, KY
Bid Date: Jun 13 2023
Fort Campbell, KY
Bid Date: Mar 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.