EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 29, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Schaumburg, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

City/County - Schaumburg 2023 Walter Payton Drive Improvements Consists of Pcc Sidewalk ( 4,311 Sf), Comb Conc Curb and Gutter (2,140 Lf), Inlet Adjust ( 29 Ea), Inlet Adjust W/ New Type 11 Frame( 3 Ea), Manhole Adjust ( 5 Ea), Manhole Adjust W/ New Type I Frame ( 5 Ea), Hma Surface Rem 4" (13,587 Sy), Hma Surface Rem 6" Special (6,244 Sy), Hma Surface Rem Butt Joint (144 Sy), Aggregate Subgrade Improvement (260 Cy), Rem and Disposal (260 Cy), Geo Fabric (1,561 Sy), Class D Patch, 6" Type Iii (350 Sy), Class D Patch 6" Type Iv (1,019 Sy), Bit Materials Trackless Tack (15,040 Lbs), Hma Binder Course, Il-19.0 N70 (3,374 Tons), Hma Surface Course Mix D N70 (1,905 Tons), Sodding Special (2,418 Sy), Supplemental Watering (1 Ea), Traffic Control and Protection Standard 701501 (1 L Sum), Traffic Control and Protection Standard 701801 (1 L Sum). Project Location: N Roosevelt Boulevard and Walter Payton Drive from Golf Road to McConnor Parkway in Schaumburg, Illinois. Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - 2023 Walter Payton Drive Improvements - 23-00147-00-RS Questions regarding the project are due on 5/5/23 @ 10 AM.

Award

Roads / Highways

$914,861.00

Public - City

Paving, Site Work

25

9

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Sodding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
224
Active Projects
127
Bidding Soon
2,754
All Active Projects
1,237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2023

July 11, 2023

img_map_placeholder

N Roosevelt Blvd & Walter Payton Dr, Schaumburg, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Walter Payton Drive Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.