BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2023 at 8:00 PM

Updated May 14, 2025

Site work and paving for a civil project in Lake Havasu City, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project consists of milling removal and hot mix Asphalt Concrete replacement of approximately 25,000 square yards of asphalt concrete pavement along London Bridge Road from SR 95 to Palo Verde Boulevard South. New Surfacing includes approximately 60 Water Valve Can Lid with Concrete Collars and 12 Sewer Manhole Lids. The work includes, but is not limited to, asphalt concrete pavement removal and replacement, water valve can and sewer manhole cover adjustments, traffic control and temporary striping. Inquiries received will then be answered in an Addendum. Project Completion Date: 90 calendar days after Notice to Proceed. Lake Havasu City reserves the right to accept or reject any or all bids or any part thereof and waive informalities deemed in the best interest of the City. Pursuant to the Americans with Disabilities Act (ADA), Lake Havasu City endeavors to ensure the accessibility of all of its programs, facilities and services to all persons with disabilities. If you need an accommodation for this meeting, please contact the City Clerks office at (928) 453-4142 at least 24 hours prior to the meeting so that an accommodation may be arranged.

Award

Roads / Highways

$1,176,115.00

Public - City

Paving, Site Work

8

9

7

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

July 3, 2023

Project location map

To Be Determined, Lake Havasu City, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.