Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Rye Brook, New York. Contact the soliciting agency for additional information.
reliminary Design, Detail Design and Construction Support Services, with an option for Construction Inspection Services for Airport Infrastructure Improvements, at Westchester County Airport, New York. Description: Notice is hereby given that the County of Westchester is seeking to retain an engineering firm to provide preliminary/ final design, Construction Support Services with an option for Construction Inspection Services for one New York State Funded project located in the County of Westchester at the Westchester County Airport. The consultant shall provide comprehensive design services in narrative and graphic form with preliminary construction cost estimates and schedules acceptable to the County. These services will also include maintaining all compliance and reporting requirements associated with NYS DoT Aviation Project Funding Agreements. The consultant's responsibilities in delivering Services are detailed by the requirements specific to this project. The design packages shall be submitted in the following phases for review by the County: Schematic Design (representing the 30% design phase) - including plans, specifications, preliminary cost estimate, a schedule, a design report and possible alternates. Design Development (representing the 60% design phase) - including plans, specifications, refined cost estimate, a refined schedule and incorporating County comments. Construction Documents (representing the 90% design phase) - including plans, specifications, detailed cost estimate, a detailed schedule and incorporating County comments. Final Documents (representing the 100% complete package to solicit bids) - including plans, specifications, anticipated cost estimate, anticipated schedule and incorporating County comments. Each phase shall include presentations by the consultant, discussions and County reviews. The consultant shall incorporate review comments into plans and specifications and shall commence to develop and update plans, specifications, cost estimates and construction schedules. The consultant shall prepare all design phases with cost estimates based on construction budget and scope as outlined below under Specific Components of the Project. The cost estimate shall be divided into logical components or groupings that comprise scope of work as outlined below. Using the developed design and design cost estimate, the consultant working in conjunction with the County will revise the project scope and drawings as required to fit within the established total construction budget. Upon County approval of the Schematic Design, the consultant shall complete the Design Development, Construction Documents and Final Documents. Either through sub-consultants or with in-house capabilities, the consultant shall be responsible to perform all survey, geotechnical investigation and any other testing normally required during design. Specific Components of the Project: Proposers are strongly encouraged to review findings of existing conditions as well as proposed changes. The availability of existing information DOES NOT excuse the consultant from performing any survey, geotechnical investigation or any other testing required to design a complete project. The County is interested in a least-cost staging strategy and construction period with minimum impact on day-to-day operations. Taking into consideration staging of work in a high security environment, proposers shall provide in their proposals a construction strategy inclusive of a bar-chart construction schedule for entire scope depicting duration of construction tasks with achievable milestones so as to confirm and/or modify 4 months estimated construction period. Work will involve the installation of approximately 1,700 linear feet of natural gas service main underneath Airport Road, demolition of two small storage buildings, removal of two 6,000-gallon underground fuel oil tanks at Buildings 6 and 26 and the relocation/construction of a new 20-space vehicle surface parking lot. The project also includes: Preparation of the Construction Safety and Phasing Plan (CSPP). Perform geotechnical investigation including non-destructive testing (NDT). Perform environmental testing on buildings to be demolished including, but not limited to, asbestos and lead testing. Permitting including New York City DEP and New York State DEC (Project location is within a New York City watershed). Perform survey in accordance with all FAA Advisory Criteria which includes, but is not limited to current versions of Advisory Circulars (AC) 150/5300-16, 17, and 18 This Work is part of County Capital Project A0099 - Natural Gas Conversion Program. GIS Information: It is mandatory to use the most current versions of the following Federal Aviation Administration (FAA) guidelines / Advisory Circulars (AC), for the collection of geospatial airport and aeronautical data funded under Federal grant assistance programs. AC 150/5300-16 "General Guidance and Specifications for Aeronautical Surveys: Establishment of Geodetic Control and Submission to the National Geodetic Survey." AC 150/5300-17 "General Guidance and Specifications for Aeronautical Surveys: Airport Imagery Acquisition and Submission to the National Geodetic Survey." AC 150/5300-18 "General Guidance and Specifications for Aeronautical Surveys: Airport Survey Data Collection and Geographic Information System Standards." AC 150/5300-13 "Airport Design." AC 150/5370-2 "Operational Safety on Airports During Construction." Cert Alert 23-02 "Safety Management Systems." Data providers should make maximum use of existing data for the airport which is traceable to the source to meet the requirements before undertaking additional data collection. Data collected or proposed for use in a project must meet the tolerances specified in the above Advisory Circulars at the 95 percent confidence level (RMSE) before being used in the project or as part of the required deliverables. The contracted surveyor will validate airport geodetic control use existing PACS (PID: LX7500), SACS (PID: AE2411) and SACS (PID: AJ8916). If the existing PACS/SACS are determined to be damaged, the project will establish temporary geodetic control as required. To ensure safety, all survey data collected by the contracted surveyor must meet the accuracy requirements in FAA Advisory Circulars 150/5300-16, 17, & 18. All data must be in the proper format in order for the National Geodetic Survey (NGS) to validate the accuracy and approve the collected data. For further information on how to comply with the requirements of the FAA Airport Survey-GIS Program, see https://airports-gis.faa.gov. No imagery will be collected or submitted for this project. The project survey will collect and provide as-built information for all required attributes for relevant features as listed in -18B. The Consultant must provide data in the following 3D geospatial vector file format: Shapefile (ESRI format), referenced to North American Datum 1983 New York State Plane East Zone in feet and 3 North American Vertical Datum 1988. Each feature must have corresponding metadata in accordance with Federal Geographic Data Committee (FGDC) metadata standards. Design will include but not be limited to: schematic design; design development; and construction document preparation including plans, specification and construction cost estimate. The selected consultants(s) shall act as the County's agent in connection with the County's responsibility for complying with the NYSDEC SPDES General Permit for Stormwater Discharges from Construction Activity and preparing any related documentation, as required. All design must be in accordance with FAA requirements. Construction Support Services will include but not be limited to: providing assistance in construction bid proceedings; analysis of bids; review of shop drawings; attending project job meetings; site visits and providing revised design and details when required by field conditions. Construction Inspection will include but not limited to: providing on-site construction inspection and oversight to ensure the quality of construction and conformity with the final plans and specifications. The design shall be in accordance with all Federal, State, County and local codes and regulations. The selected consultant shall act as the County's agent in connection with the County's responsibility for complying with the NYSDEC SPDES General Permit for Storm Water Discharges from Construction Activity and prepare any related documentation as required. In addition to all the other requirements, the Consultant recognizes and understands that it is an essential element of the work that the Consultant insure that any work it does, including but not limited to any plans, specifications, drawings, designs, management and advice, complies with the County's policy of Best Management Practices for Water Quality Protection. Therefore, the Consultant shall, at a minimum, incorporate the New York State Department of Environmental Conservation (hereinafter "NYSDEC") technical standards for erosion and sediment control contained in the document, New York Standards and Specifications for Erosion and Sediment Control, as the same may be amended from time to time. In addition, the Consultant shall incorporate for the design of water quality and water quality controls (post-construction stormwater control practices), the NYSDEC standards detailed in the New York State Storm Water Management Design Manual, as the same may be amended from time to time. Both documents should be obtained from the NYSDEC website to insure that the Consultant has the latest versions of such documents. In addition, the Consultant shall apply these standards to ALL work done for the County, regardless of the size of the project. For example, if the State standards applies only to projects of 1 acre or greater and the County's project is less than one acre, then the Consultant shall utilize the State standard for the larger project. To the extent that there is any conflict between the County standards and the standards required by any other regulatory agency, the Consultant shall utilize the stricter standard. The Consultant shall determine if the project shall require any permits from regulatory agencies, including, but not limited to, permits that concern storm water management. To the extent that the services rendered by the Consultant involve design of the project and to the extent that any permits are required for the project, the Consultant shall complete the permit application and prepare the necessary information required by the permitting agency, including, but not limited to, the preparation of a Storm Water Pollution Prevention Plan.
Conceptual
Transportation Terminals
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
240 Airport Rd, Rye Brook, NY
Related To This Project
Rye Brook, NY
Bid Date: May 17 2023
Rye Brook, NY
Bid Date: Jun 12 2023
Rye Brook, NY
Bid Date: Jun 20 2023
Rye Brook, NY
Bid Date: Jun 27 2023
Rye Brook, NY
Bid Date: Jul 19 2023
Rye Brook, NY
Bid Date: Jul 27 2023
Rye Brook, NY
Bid Date: Nov 27 2018
Rye Brook, NY
--
Rye Brook, NY
Bid Date: Sep 24 2018
Rye Brook, NY
Bid Date: Mar 28 2023
Rye Brook, NY
Bid Date: Mar 21 2023
Rye Brook, NY
Bid Date: Mar 14 2023
Rye Brook, NY
Bid Date: Mar 14 2023
Rye Brook, NY
Bid Date: Oct 04 2022
Rye Brook, NY
Bid Date: Sep 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.