BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Lemay, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The removal of an existing bridge and pedestrian bridge and replacement with a precast concrete box culvert as well as new pavement on Buckley Road along with sidewalk replacement and new curb ramps with truncated domes along with other incidental items within St. Louis County. Question Deadline 07/19/2023 at 5:00 PM CT All questions to be sumbitted to Contract Administrator & Media Manager: Shandrika Combs at SCombs@stlouiscountymo.gov

Bid Results

Roads / Highways

$579,523.00

Public - County

Paving, Site Work

35

8

13

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
147
Bidding Soon
1,254
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.