Site work and new construction of a residential development in Stilwell, Oklahoma. Completed plans call for the construction of a 14-unit residential development; and for site work for a residential development.

Project consists of a new residential complex with associated site work. Work includes 14 residences of approximately 1,800-2,000 square feet each. Direct all bidding questions to: Calvin Henrie, Preconstruction Manager Maska Builders, LLC 555 N Elm St Jenks, OK 74037 O: (918) 392-7083 F: (918) 392-7084 E: chenrie@maskabuilders.com Includes, but is not limited to, providing all supervision, labor, materials, tools, supplies, insurances, bonds, hoisting, scaffolding, safety controls, etc. to provide a complete work package of the above-mentioned Summary of Bid. The following is a list of items to be included in your proposal. Please refer to the contract documents for further requirements. This list, in no way, relieves the bidder of responsibility or the liability of items not listed that are "typical" to the scopes of work covered in this bid package. Bidder is to assume that the following is provided and installed by the bidder including all labor, equipment, and materials. 1) It is the intent of this package to provide all building and site concrete, reinforcing, and sub slab termite treatment 2) Provide all concrete materials, labor, placement equipment, curing measures, and excavation work to complete all specified footings, grade beams, foundations, post-tension cables and installation, slabs on grade, under slab granular fill, sidewalks, equipment pads, curbs, gutters, light poles bases, and site paving etc. 3) Provide and install concrete base, wall, and below grade waterproofing for monument sign. Coordinate with Construction Manager and signage contractor for final dimensions. 4) Refer to the Geotechnical Engineering Report prepared by Building and Earth dated 3/15/23 5) Provide and install all concrete accessories (water stops, waterproofing, primers, carton forms, etc.) 6) Excess excavated materials are to be disposed of offsite by this subcontract. 7) Provide all reinforcing and accessories necessary to complete this scope of work. Masonry package will provide any reinforcing needed for masonry. 8) Provide all formwork, termite treatment, and vapor barriers. 9) Provide all keyways, expansion joints, saw cuts, tactile warnings, and associated materials. 10) Coordinate and provide proper curing methods. 11) Provide all concrete weather and temperature protection. 12) Dewatering of excavations related to this scope of work is included. 13) Coordinate all materials testing with the construction manager. The CM will cover the cost of materials testing. Any additional testing resulting from failed test will be paid for by this subcontract. 14) All waste and wash out concrete are the responsibility of this subcontract. Removal of said concrete is the responsibility of this subcontract. 15) Provide all layout and staking as it pertains to this scope of work. The Construction Manager will provide control points. 16) Please refer to project specifications for any related flatness requirements. 17) Caulk all concrete joints in accordance with the construction documents. 18) Provide all barricades, flagmen, dewatering and safety protection required to accomplish this scope of work in a safe manner 19) Include all daily labor costs per Cherokee Nation TERO Law 20) Include Davis-Bacon Wage rates and certified payroll

Post-Bid

Residential Subdivision

$5,000,000.00

Public - Federal

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Membrane Roofing, Roll Roofing, Flashing and Sheet Metal, Flexible Flashing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
51
Bidding Soon
768
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

July 20, 2023

img_map_placeholder

1500 W Young Ave, Stilwell, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Crittenden Addition Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.