Published May 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Port Arthur, Texas. Completed plans call for site work for a water / sewer project.

1. Contractor shall remove and replace existing 12 AC water line outside of the tank site; under concrete, including saw cutting, removing and replacing existing 6 concrete driveway, excavation and backfill, disposal of the AC piping, piping, fittings, valves, connections between the existing AC line and new DI line, testing and sterilization, all in accordance with the plans and specifications. 2. Contractor shall remove and replace existing 12 lead joint DI line from the Citys system line to the tank fill line inside of the dry riser, including excavation and backfill, new DI piping, disposal of the AC piping, fittings, valves, repairing the concrete pedestal wall penetrations, connections between new DI line and existing lead joint DI line, removing and reinstalling the existing pressure transducer and connections to the existing lighting panel, testing and sterilization, all in accordance with the plans and specifications. 3. Contractor shall remove and replace the existing 6 diameter drain line gate valve including piping, fittings, concrete supports and valve, connections between new DI line and existing lead joint DI line, all in strict accordance with the plans and specifications. 4. Contractor shall remove and dispose of the existing 6 bypass line including removing piping, fittings, and valves, all in accordance with the plans and specifications. 5. Contractor shall remove and dispose of the existing abandoned 6 line from the east side of the inner wall to the west side of the outer wall, including cutting the existing 6 water line and installing MJ caps, removing and disposing of the valve and fitting, all in strict accordance with the plans and specifications for 6. Contractor shall remove all debris, trash, and wooden shelving from the interior ground level of the tank, all in strict accordance with the plans and specifications. 7. Contractor shall provide surface preparation and apply coating to all exposed piping, in accordance with Item 600, all in strict accordance with the plans and specifications. 8. Contractor shall inspect and repair the existing dry riser lighting system; from ground level to the top of the dry riser and install four (4) light fixtures at ground level around the interior of the tank pedestal, including all conduit and conductors, light fixtures, switches, and connections to the existing lighting panel, all in strict accordance with the plans and specifications. 9. Contractor shall fine grade and place approximately 1256 square feet of 4 thick compacted gravel surfacing inside the entire interior surface of the tank pedestal, all in strict accordance with the plans and specifications The Contractor shall contact Mrs. Jess Liao, Water Utility Engineer at (409) 983-8151 prior to starting any work within the project site.

Post-Bid

Water / Sewer

$204,000.00

Public - City

Site Work

8

6

7

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
59
Bidding Soon
883
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

June 26, 2023

Project location map

Multiple Locations, Port Arthur, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.