BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for an educational facility in Hayward, California. Completed plans call for site work for a educational facility; and for paving for a educational facility.

Installation of storm drainage, concrete walks, asphalt paving including landings at base of ramps, fencing, grading, base rock, connection of water and sewer, and signage to 3 portable classrooms. The Project consists of performing labor and supplying all materials for all the work delineated on the civil and architectural drawings and specifications. This includes but is not limited to the installation of storm drainage, concrete walks, asphalt paving including landings at base of ramps, fencing, grading, base rock, connection of water and sewer to stub outs at rear of building, and signage to 3 portable classrooms. Supply and installation of the portable classroom buildings, ramps, sinks and associated interior plumbing, cabinets, window coverings, fire extinguishers and work shown on the electrical drawings is not part of the scope of this project. As security for its Bid, each Bidder shall provide with its Bid form : o a bid bond issued by an admitted surety insurer on the form provided by the District, o cash, or o a cashier's check or a certified check, drawn to the order of the Hayward Unified School District, in the amount of ten percent (10%) of the total bid price. This bid security shall be a guarantee that the Bidder shall, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Project. All bidders' questions must be submitted in writing via email to brian@trigroup.us. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. 3 TEMPORARY CLASSROOMS, INSTALLATION AND ASSOCIATED SITE WORK.

Award

Educational

$215,110.00

Public - City

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
89
Bidding Soon
1,862
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 19, 2023

img_map_placeholder

456 Laurel Ave, Hayward, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.