BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Chiloquin, Oregon. Contact the soliciting agency for additional information.

Contract Award Date: Aug 21, 2023 Contract Award Number: 12363N23C4020 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Y2BNXRK9LBQ7 Contractor Awarded Name: TWC CORP Contractor Awarded Address: Wilsonville, OR 97070 USA Base and All Options Value (Total Contract Value): $9,814,569.00. Update Question and Answer - No amendment will be posted for this update. Question - Item 31b Road reconstruction Construction Survey & Staking states a lump sum quantity of 20. What is unit of measure Stations, miles Answer - Construction Survey and Staking only applies and will only be required for 31(l) Roadway Excavation - Curve Widening. Both Item 31(b) and Item 31(l) are lump sum with gross quantity of 20. Both Items will be awarded together as needed. Background: The Go Big G-Z Stewardship IRSC shall be awarded under the following authority: Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. NAICS: 115310: Support Services for Forestry, size standard: 34M Fuels Management Services. Stewardship authorities permit the Government to solicit this requirement as Full and Open competition. Project Location: The project is located near the towns of Chiloquin, OR and Sprague River, OR between HWY 46 and 858 and surrounds Calimus Butte and East of Fuego Mountain. Legal description is: In all or portions of T33S R10E Sec 13-16, 21-29, 31-36. T33S R11E Sec 7-11, 13-24, 27-31. T34S R9E Sec 1, 2, 10-12, 13-17, 20-29, 32-36, T34S R10E Sec 1-36. T34S R9E Sec 6, 18, 19, 29-31, T35S R9E Sec 1-6, 9-12. T35S R10E Sec 1-12, 17, 16. R35S R11E Sec 6, 7. Willamette Meridian; Klamath County, Oregon Period of Performance: All work shall be completed by December 31, 2030. Description of Work: The intent of the project is to dramatically increase the pace and scale of forest restoration treatment to mitigate risk of catastrophic wildfire. The objective of this project is: For the contractor to complete the end-results from NEPA handoff through final completion of the project area. Contractor shall identify what work activities are needed across all project acres to meet the desired end-result objectives that shall be presented in maps and a detailed Implementation Plan prior to commencing layout. After the initial Implementation Plan (Design Detailed Logging Plan, Road Analysis Plan, Service Treatment Plan, and Contract Area Maps) has been accepted and approved, contractors will then: layout Timber Removal and Service Only treatment units. designate retention areas and clump marking or other clump retention designation. complete timber cruises for each identified timber removal treatment area. Perform road maintenance and/or road reconstruction required for forest product removal complete all on the ground timber removal and service work activities. Total timber quantities and treatment acres are unknown and shown as estimated gross quantity. Completion and acceptance of Item 1 will determine true needed quantities for all other Items. The use of "Stepladder Pricing" enables the Government to establish Firm-Fixed Pricing at time of award for all Items based on differing complexity. Changes have been made to the pre-solicitation drafts and include, but are not limited to: Clauses specific to Construction requirements have been added in their entirety to the solicitation. Timing of FS inspections and deliverables back to contractor have been added to Appendix A. Standard B-provisions of Appendix B have been revised and updated recently for all IRSCs, these updates have been incorporated into this contract. C-Provisions for Contract Time Adjustments (only applicable to IRTCs) were incorrectly added in the pre-solicitation drafts and have been removed. Awarded contract will be a commercial services contract with requirements for timber removal. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract.

Award

Conservation and Development

$9,814,569.00

Public - Federal

Service, Maintenance and Supply

23

18

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
59
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 11, 2023

img_map_placeholder

Multiple Locations, Chiloquin, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.