Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 10, 2025 at 7:00 PM
Updated December 11, 2025
Site work for a water / sewer project in Whitby, Ontario. Design plans call for site work for a water / sewer project.
Energy Center construction TMELINE: Design is ongoing. Construction is tentatively planned for 2027.
Design
Water / Sewer
$25,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2027
289 Water St, Whitby, ON
Related To This Project
Whitby, ON
Bid Date: May 18 2023
Whitby, ON
Bid Date: Jun 13 2023
Whitby, ON
Bid Date: May 30 2023
Whitby, ON
Bid Date: May 30 2023
Whitby, ON
Bid Date: Jun 02 2023
Whitby, ON
Bid Date: Jul 09 2024
Whitby, ON
Bid Date: Jun 01 2023
Whitby, ON
Bid Date: May 16 2023
Whitby, ON
Bid Date: May 09 2023
Whitby, ON
Bid Date: Nov 16 2023
Whitby, ON
Bid Date: May 19 2023
Whitby, ON
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
