Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 28, 2023 at 7:00 PM

Updated April 23, 2025

Renovation of a mixed-use development in New York, New York. Completed plans call for the renovation of a 25,000-square-foot, four-story above grade educational facility.

Description: Full Program Accessibility/PA System Replacement Performance Period: 900 Continuous Calendar Days (See Page CC-3 and Appendix B) Liquidated Damages: Three Thousand ($3,000) Dollars per Continuous Calendar Day and as set forth in the Construction Contract Page CC-3 and Appendix B A Bid Bond along with its Power Attorney prepared on the form attached to the Construction Contract as Appendix C or a Certified Check of the Bidder for five (5%) percent of the Bid Amount must accompany the Lump Sum Bid Form (AppendixA) $3,000,001 to $10,000,000 $10,000,001 and Above

Award

Educational

$13,664,000.00

Public - City

Renovation

254

22

19

6

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,240
Active Projects
514
Bidding Soon
7,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 21, 2023

February 21, 2024

Project location map

88 Woodbine St, New York, NY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed