BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a bridge / tunnel in Salmon, Idaho. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

This Solicitation replaces Notice ID: 1282B123R0057 under Solicitation No. 1282B123R0057 that was originally a HUBZone set-aside. This Solicitation is a Total Small Business set-aside. The Salmon-Challis National Forest has an Aquatic Organism Passage project to replace an existing ford with a bridge. Work includes channel restoration, installation of a government furnished bridge on contractor provided abutments and the construction of bridge approach roadways. Rock and aggregate materials are available from government sources. Alternate (Commercial) sources proposed by the contractor will need to be approved for material suitability and weed free nature of the source. The contractor is responsible for the acquisition of the abutment materials per the attached plans and specifications along with the erection of the abutments. Government furnished materials are located at 3 locations in the vicinity of the project. The prefabricated bridge will be staged in Salmon, Idaho. The contractor is responsible for transporting the bridge to the work . An instream work window of 7/15 to 8/15 has been established. All work within the ordinary high-water mark including de-watering, excavation and backfill, channel restoration and re-watering of the channel shall occur within this window. Refer to the attached Schedule of Items, Statement of work, Prelim Moyer Creek FSSS, Moyer Creek Final Drawings, Project Design features, , Moyer Creek Bridge Shop Drawings, Moyer Access map and Materials vicinity maps for specifications, drawings, requirements and locations. There is no Pre-Proposal is planned. The is open to the public and Offers are encouraged to the on thier own. If there are questions, refer to the Q & A Moyer Visit_6.28.23 document and any further quesitons shall be addressed to Susan Kunath, Contract Specialist at susan.j.kunath@usda.gov . Proposals are due: August 30, 2023 at 1:00 p.m. CT. and are to be sent electronically to : Susan Kunath at susan.j.kunath@usda.gov. with the Offers name and Moyer Bridge in the subject line. Government's Contracting Point of Contact: Susan Kunath email: susan.j.kunath@usda.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Bridges / Tunnels

$250,000.00

Public - Federal

New Construction, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
30
All Active Projects
15
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

September 29, 2023

img_map_placeholder

1206 S Challis St, Salmon, ID

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.