BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Wagoner, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The American Burying Beetle (ABB) is listed by the U.S. Fish and Wildlife Service (USFWS) as a threatened species. As such, the ABB is protected under the Endangered Species Act (the Act), which prohibits any take that may interfere with the survival and recovery of the species. A final rule under the authority of section 4(d) of the Act provides measures that are necessary and advisable to provide for the conservation of the American burying beetle. The 4(d) rule identifies certain activities that are excepted from take prohibitions, which differs by geographic area. FHWA delegatesthe ODOT Natural Resources Program biologiststo assessimpactsto species and to determine when application of the 4(d) rule for ABB is appropriate. Artificial lighting is known to disturb nocturnal insects essential activities, including migration, dispersal, foraging, mating, and reproduction. For any federally funded projects let through ODOT within suitable ABB habitat, measures will be taken to minimize use of artificial lighting during construction. If night construction is necessary, direct light will be shielded to the work area and light will be prevented from projecting upwards. Bridge rehabilitation Sh-51: over verdigris river overflows (1, 2 and 3), 2.8 miles, 3.3 miles and 3.6 miles East of the Muskogee turnpike near Coweta. Project length = 0.00 miles Counties : WAGONER Submit any questions or concerns to the Office Engineer Division via: - Email: ODOT-Prebid.Question@odot.org - Phone: (405) 521 - 2625 Please include the words " Pre-bid question(s)" along with the call order and the bid opening date of the project in question in the subject line of the correspondence. Unless otherwise specified in the proposal, all bids must be submitted with a proposal guaranty equal to 5% of the bid total. Bids submitted electronically must have their bid bonds verified electronically through the electronic bidding system. Written bids must have their bond stapled to the back of the proposal. In lieu of a bid bond, a certified/cashier's check made payable to the Oklahoma Department of Transportation may be submitted as a proposal guaranty. Checks must be delivered to Office Engineer Division prior to the bid opening. Proposal checks will be held or returned by the Department as per Subsection 103.04 of the State Standard Specifications. OKDOT - 512 Bridge Rehabilitation

Award

Bridges / Tunnels

$1,034,363.00

Public - State/Provincial

Paving, Site Work

3

6

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
60
Bidding Soon
795
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

October 2, 2023

img_map_placeholder

OK-51, Wagoner, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.