BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Gabriel, California. Contact the soliciting agency for additional information.

Respondents should have significant experience and familiarity in working with the Los Angeles Regional Water Quality Control Board (“LARWQCB”), complying with the NPDES/MS4 Permit Program, Total Maximum Daily Loads (“TMDLs”) requirements for the San Gabriel River, Los Angeles River, Rio Hondo Watershed Area and be familiar with the Watershed Management Program (WPM), Enhanced Watershed Management Plan (“EWMP”) and Coordinated Integrated Monitoring Program (“CIMP”). In addition to specific tasks identified in this R e q u e s t f o r P r o p o s a l ( “ R F P ) , it is the intent of the City that the selected firm will provide additional compliance related support, as needed, based on an approved schedule of hourly rates or pre-negotiated lump sum. The Water Quality Act of 1987 added Section 402(p) to the federal Clean Water Act. This section required the United States Environmental Protection Agency to regulate the discharge of storm water and urban runoff to the waters of the United States, creating the National Pollutant Discharge Elimination System Program. The City of San Gabriel is currently covered by the MS4 Order R4-2021-0105, NPDES Permit No. CAS004004. All questions or requests for clarification must be emailed to Capucine Hernandez, Management Analyst at chernandez@sgch.org by 3:00 p.m. on Thursday, May 4, 2023. Email one (1) PDF copy of the proposal to Capucine Hernandez chernandez@sgch.org by 3:00p.m. on Wednesday, May 17, 2023. Proposals received after the deadline will not be considered. The subject heading of the email should include “RFP #23-03” and the consultant’s name. All proposals and requested compensation must remain valid for a minimum period of ninety(90) calendar days after the submission deadline. Responses may not be modified or withdrawn during this period of time except in accordance with this RFP and with written permission granted by the City.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
106
Bidding Soon
2,254
All Active Projects
1,005
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, San Gabriel, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.