BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Orange City, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This is a federally assisted project and is subject to Federal Labor Standards which include, the Davis-Bacon Act (payment of prevailing wage rates) and the Copeland Act (anti-kickback of wages & submission of weekly certified payroll reports), as well as other provisions including 24 CFR 85.36 (bonding requirements), and Section 3 & M/WBE. Laborers and mechanics employed by primary contractors and sub-contractors performing construction work on this project shall be paid wages at rates not less than the prevailing rates as determined by the Secretary of Labor in accordance with the Davis-Bacon Act. The prime contractor is responsible for the enforcement of wage compliance and support documentation for the duration of the project and may be held liable for wage restitution. The applicable information regarding the laws and regulations stated above are included in the bid packet. A. The Scope of works includes, but not limited to the following items: a. All permits and inspections as required by Public Works Department and inspection hold points. The Contractor will be responsible for obtaining, managing, and clearing all permits associated with the work to be completed. b. Demolish and removal 20 ft of existing sidewalks that not comply with the FDOT standard. c. Removal and disposal of trees, palms, shrubs or any other vegetation that interferes with the construction of sidewalks. Include trim shrubs as necessary. d. Excavation to install all the proposed sidewalk per Typical Sections details. e. Construct approximately 717 square yards of 4" thick sidewalk and 9 square yards of 6" thick sidewalk (over driveway). The sidewalk shall have a minimum width of 5 feet with a maximum slope of 2% (.02), and must include detectable warning pads. Concrete strength: 3000 psi; w/c = 0.5. f. Construct 2 Flush Shoulder Sidewalk Curb Ramps (Option B). g. Install detectable warning pads. h. Provide pavement markings, where include crosswalk and stop bars. Bid Bond 5% questions or concerns regarding this ITB must be submitted in writing, to David Santiago, Purchasing Administrator not later than 14 calendar days prior to bid due date. Questions should be emailed to dsantiago@ourorangecity.com referencing the ITB number in the subject line. Last day for questions: Thursday, May 18, 2023

Award

Sidewalks / Parking Lot

$123,188.00

Public - City

Paving, Site Work

10

6

2

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
344
Active Projects
162
Bidding Soon
2,446
All Active Projects
1,011
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 1, 2023

July 5, 2023

October 3, 2023

img_map_placeholder

S Thorpe Ave, Orange City, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.