BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a mixed-use development in Buckeye, Arizona. Completed plans call for site work for a transportation facility; for paving for a transportation facility; water / sewer project; and for outdoor lighting for a transportation facility.

This project will reconstruct and realign the southern taxiways consisting of approximately 12,000 square yards (SY) of asphalt concrete (AC) pavement. It should be noted that the southern taxiways are currently unnamed and as part of this project the parallel taxiway portion has been renamed to Taxiway ‘J’ while the southern connector to Taxiway ‘D3’. The existing AC pavement is experiencing varying degrees of distress and is in need of reconstruction from the subgrade up through the pavement surface. Per the information available on ADOT’s Airport Pavement Management System (APMS) web application, the 2017 Pavement Condition Index (PCI) for the taxiway was 49, and projected to decline to 38 by 2023, indicating that major rehabilitation is recommended for this pavement. The Taxiway & South Apron Reconstruction - Phase 1 project, completed in November 2020, included the reconstruction of the southern aircraft parking apron. The apron taxi lane was realigned to meet Object Free Area clearance criteria and the reconstruction of Taxiway ‘J’ will continue on this new alignment. Currently the existing taxiway is not in line with the apron taxi lane. Taxiway ‘D3’ will be shifted approximately 80 feet from its existing alignment to provide a straight path from Taxiway ‘J’ to the Runway ‘35’ threshold. The realignment of Taxiway ‘D3’ will require curved taxiway centerline markings to match back into Taxiway ‘A’ beyond Taxiway ‘H’, which is twice as wide as required by FAA standards, until such time that its width is corrected, and its centerline realigned. A new storm drain will serve the infield areas between Taxiway ‘J’ and the airport hangars and will outlet into a channel running parallel to Taxiway ‘J’. A new culvert will convey flows underneath Taxiway ‘D3’ from the infield area to the south. This project will install new LED taxiway edge lighting and airfield guidance signage to enhance pilot safety, along with new underground conduit infrastructure and upgrades in the Electrical Vault including providing a new constant current regulator (CCR). Location of the Project: City of Buckeye, Buckeye Municipal Airport. All contractors engaged in City of Buckeye construction shall be licensed in the State of Arizona. Question Deadline 05/18/2023 at 5:00 PM MT

Bid Results

Transportation Terminals

$2,480,935.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

14

8

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
40
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.