Published June 1, 2023 at 8:00 PM

Updated April 3, 2025

Site work and new construction of a water / sewer project in Columbus, Georgia. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

1. Construction of a new disinfection building with unloading station and a new chemical feed vault on an existing 72-inch combined sewer line at the 29th Street site; 2. Upgrades to the dechlorination system at the Uptown CSO Facility, and conversion of the existing advanced treatment building to a chlorine contact chamber; 3. Upgrades to the disinfection system at the South Commons CSO Facility. 4. Installation of a new dechlorination system at the South Commons CSO Facility, conversion of an existing sampling station to a new dechlorination feed station, construction of a new sampling station with fiberglass building, and site improvements including a new access driveway from the existing driveway to the new sampling station. 5. Re-piping the grit discharge lines from six existing grit vortex units, rerouting piping, replacing vortex unit influent pinch valve sleeves, replacing existing pumps and installing new pumps at the Uptown CSO facility. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of 100 percent of the Bid. The Owner reserves the right to reject all Bids, to waive informalities and to readvertise. Furnishing all products, materials and equipment and performing all labor necessary to complete and put into operation the Uptown and South Commons CSO Disinfection and Dechlorination (Project No. 35774-71) SCADA and Instrumentation, Building Security Systems, Construction Verification Surveying, Removal of Unsuitable Material and Replacement with, Crushed Stone. MBE (10%), WBE (5%) Uptown and South Commons Disinfection and Dechlorination project - substantially completed within 400 consecutive calendar days; final completion- 460 consecutive calendardays Uptown CSO Grit Improvements project - substantially completed within _550___ consecutive calendar days; final completion- 610___ consecutive calendar days. 1. Construction of a new disinfection building with unloading station and a new chemical feed vault on an existing 72-inch combined sewer line at the 29th Street site; 2. Upgrades to the dechlorination system at the Uptown Park CSO Facility with a new storage tank and chemical feed pumps, and conversion of the existing advanced treatment building to a chlorine contact chamber; 3. Upgrades to the disinfection system at the South Commons CSO Facility including replacement of two bulk storage tanks and new chemical feed pumps; 4. Installation of a new dechlorination system at the South Commons CSO Facility with two new bulk storage tanks and new chemical feed pumps, conversion of an existing sampling station to a new dechlorination feed station, construction of a new sampling station with fiberglass building, and site improvements including a new access driveway from the existing driveway to the new sampling station. 5. Re-piping the grit discharge lines from six existing grit vortex units, reroutingpiping, replacing vortex unit influent pinch valve sleeves, replacing existing pumps and installing new pumps at the Uptown CSO facility. Question Deadline 05/25/2023 Information / Clarification shall be submitted in writing by Email.

Post-Bid

Water / Sewer

$150,000.00

Public - City

New Construction, Site Work

167

45

33

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Product Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Air Barriers, Membrane Roofing, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Plastic Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Wall Finishes, Special Wall Surfacing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, HVAC Power Ventilators, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Underground Ducts and Raceways for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Battery Units, Static Uninterruptible Power Supply, Transfer Switches, Automatic Transfer Switches, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Screening Devices, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Material Storage, Bulk Material Storage, Material Storage Tanks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
47
Bidding Soon
666
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

img_map_placeholder

Multiple Locations, Columbus, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.