Site work and paving for a road / highway in Albany, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work generally consists of furnishing all labor, equipment, materials, and supervision for the construction of a full depth reclamation (FDR) using asphalt concrete pavement placed over in-place cement treated base, adding shoulder rock, replacing culverts, and striping the roadway per these Contract Documents. Prequalification can be met by bidder submitting Oregon Department of Transportation prequalification or providing a minimum of two (2) examples of similar construction projects completed. In addition, the Contractor must provide a statement of experience for FDR with cement treated base that lists a minimum of two (2) successfully completed projects of at least 6,000 square yards. 3) The Bid Proposal must be submitted on the prescribed form and shall contain a statement by the bidder that the bid complies with the provisions of ORS 279C.800 to 279C.870, and contain a statement as to whether the bidder is a resident bidder as defined in ORS 279A.120. 4) The Contractor must be registered with the Oregon Construction Contractors Board and shall have the appropriate license necessary to perform the work under this bid, or the State Landscape Contractors Board in order for his/her bid to be considered on construction contracts. 5) The Bid Proposal must be accompanied by cash, cashier's check, certified check or bid bond payable to Benton County, Corvallis, Oregon, in an amount not less than ten percent (10%) of the total bid amount 6) The CONTRACTOR shall, within two working hours of the date and time of the deadline when the bids are due to the COUNTY, submit to the COUNTY a disclosure of any first-tier subcontractor that will be furnishing labor or materials in connection with the public improvement and whose contract value is equal to or greater than: a) Five percent of the total project bid or $15,000, whichever is larger; or b) $350,000, regardless of the percentage of the total project bid. The disclosure of first-tier subcontractors shall include: a) The name and address of each subcontractor; b) The registration number assigned to the subcontractor by the Oregon Construction Contractors Board if the subcontractor is required to have a certificate of registration issued by the board; c) The category of work that each subcontractor will perform; and the amount of the contract of the subcontractor.

Award

Roads / Highways

$1,365,837.00

Public - City

Paving, Site Work

10

3

4

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
31
Bidding Soon
527
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

July 3, 2023

img_map_placeholder

Springhill Dr, Albany, OR

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.