Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 16, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Half Moon Bay, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

04-SM-84-6.0 *** SAN MATEO COUNTY NEAR LA HONDA 0.2 MILE WEST OF SAN GREGORIO CREEK BRIDGE General work description: Construct soldier pile wall. The Department will receive sealed bids for CONSTRUCTION ON STATE HIGHWAY IN SAN MATEO COUNTY NEAR LA HONDA 0.2 MILE WEST OF SAN GREGORIO CREEK BRIDGE. District-County-Route-Post Mile: 04-SM-84-6.0 Contract No. 04-2K6404 The Contractor must have either a Class A license or a combination of Class C licenses which constitutes a majority of the work. The DBE Contract goal is 22 percent. Federal-aid project no.: ACST-P084(058)E For the Federal training program, the number of trainees or apprentices is 7. Bids must be on a unit price basis. Complete the work within 160 working days. The estimated cost of the project is $2,770,000. The Department will receive bids until 2:00 p.m. on the bid open date via Bid Express website. Bids received after this time will not be accepted. For more information refer to the Electronic Bidding Guide at the Office Engineer's website. The Department will open and publicly read the bids through webcast/teleconference services immediately after the specified closing time. For bid results go to: Select Electronic Bidding under the Bidding tab. District office addresses are provided in the Standard Specifications. Present bidders' inquiries to the Department and view the Department's responses at: Questions about alleged patent ambiguity of the plans, specifications, or estimate must be asked before bid opening. After bid opening, the Department does not consider these questions as bid protests. Submit your bid with bidder's security equal to at least 10 percent of the bid. Prevailing wages are required on this Contract. The Director of the California Department of Industrial Relations determines the general prevailing wage rates. Obtain the wage rates at the DIR website, , or from the Department's Labor Compliance Office of the district in which the work is located.

Award

Roads / Highways

$2,194,750.00

Public - State/Provincial

Paving, Site Work

68

8

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
401
Active Projects
142
Bidding Soon
3,007
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2023

August 7, 2023

Project location map

To Be Determined, Half Moon Bay, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed