BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Wildomar, California. Conceptual plans call for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Reconstruct and widen the east side of Monte Vista Dr. Improvements will include sidewalk, trail, and landscaping. Portion of project will be designed and constructed with the RCFC&WCD Lateral C Basin and Storm Drain Project (CIP 063) anticipated to begin construction in FY 21/22 and complete in FY 23/24. Developer in-lieu funding includes mitigation measures and DIF impacts and will supplement/offset funded sources. This project is included in the City of Wildomar's FY 2023-2026 Capital Improvement Plan (CIP). As of May 24, 2023, information regarding a design team or a general contractor is not available. Construction is anticipated in 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$885,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
652
Active Projects
276
Bidding Soon
3,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

Project location map

Monte Vista Dr. - Bundy Canyon Rd. to south side of TR 32024, Wildomar, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.