Demolition, site work and new construction of a water / sewer project in Elizabeth, Pennsylvania. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
Award Details Contract Award Date: Aug 22, 2023 Contract Award Number: W911WN23C8010 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: SF1XJ2YL5KD9 Contractor Awarded Name: JOSEPH B. FAY CO. Contractor Awarded Address: Pittsburgh, PA 15212 USA Base and All Options Value (Total Contract Value): $29,672,873.00 The contract consists of work associated with Monongahela River Locks and Dam No. 3 demolition, establishment of the new navigable channel and stabilization of the monoliths to remain after construction. All demolition elevations in the plans and specifications created for this project are shown in the NAVD 88 datum. The existing reference drawings are shown in the NGVD 29 datum or earlier. Specific features of work under the contract mentioned below do not represent a construction sequence. The contract features of work include, but are not limited to the following: (a) Breach the existing dam for pool equalization. This step in the construction sequence includes all activities required to prepare the dam for breaching. Breaching of the dam may occur through either blasting or mechanical removal means. A demolition plan detailing the preferred method will be submitted by the Contractor for approval. (b) Equalization of pools 2 and 3. Pool equalization is required to be a minimum of 3 days for environmental considerations. This time frame will allow enough time for mussels along the banks of Pool 3 to migrate to the new water elevation. Navigation will be notified at least 30 days in advance of the breach regarding closure limitations and durations. (c) Demolish the dam. The entirety of the dam will be demolished to EL710.1. Placement of the stability berms adjacent to the left dam abutment may begin once the dam is removed within the installation area of the berm. (d) Opening of the new navigable channel. Surveying 300 FT upstream and 600 FT downstream of the removed dam will occur to locate material above the required demolition elevation within the new navigable channel. Dredging will be required to remove any high spots identified. Navigation will be notified when the new navigable pass is open. At this time, the land and river chambers will be permanently closed for passage of traffic. Placement of the stability berms on the river face of the upper guide wall and filling of the flume way with preplaced aggregate concrete may begin. (e) Removal of mechanical and electrical equipment in the land and river chambers. (f) Demolition of the middle wall. The middle wall will be demolished to EL 713.1. Install the stability berms within the land chamber once the middle wall is fully demolished. (g) Demolition of the river wall. The river wall will be demolished to EL 713.1. This includes the upper guard wall cells and river chamber extension cells. (h) Complete installation of permanent stabilization measures for the flume wall, land wall, upper guide walls, and dam abutment. (i) Processing and disposal of remaining demolition material. Any remaining demolition material after reuse of the processed concrete rubble for construction of the stability berms and preplaced aggregate will need to be processed and disposed of at an approved disposal facility. This includes material not meeting the requirements for reuse. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$29,672,873.00
Public - Federal
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2023
September 6, 2023
To Be Determined, Elizabeth, PA
Related To This Project
Elizabeth, PA
Bid Date: May 24 2023
Elizabeth, PA
Bid Date: Jun 13 2023
Elizabeth, PA
Bid Date: Jun 13 2023
Elizabeth, PA
Bid Date: Aug 03 2023
Elizabeth, PA
Bid Date: Sep 08 2023
Elizabeth, PA
Bid Date: Sep 06 2023
Elizabeth, PA
Bid Date: Feb 03 2022
Elizabeth, PA
Bid Date: Feb 09 2022
Elizabeth, PA
Bid Date: Feb 14 2023
Elizabeth, PA
Bid Date: Jan 31 2023
Elizabeth, PA
Bid Date: Apr 17 2019
Elizabeth, PA
Bid Date: Jun 02 2022
Elizabeth, PA
Bid Date: Aug 24 2021
Elizabeth, PA
Bid Date: May 26 2022
Elizabeth, PA
Bid Date: Apr 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.