BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a road / highway in San Jose, California. Completed plans call for the renovation of a road / highway.

Summary of Work: Project Description. The Project objective is to repair existing erosion damage to the levee due to ongoing animal intrusion and burrowing activities, and to minimize and prevent the potential for future damage due to animal activities along the levee face which can potentially undermine the levee's structural integrity. The Project scope includes two (2) repair sites with a combined length of approximately 1,600 feet that will connect to each of the previously repaired 929 feet segment of the outboard side of the levee. 1. Compliance with NPDES General Permit, and Stream Maintenance Program 2 (SMP2) Permits, including Storm Water Pollution Prevention Plan preparation, installation of Best Management Practices; 2. Clearing and grubbing within the project limits, including the removal of vegetation, and other miscellaneous items; 3. Levee excavation, including testing and disposal of unsuitable materials; 4. Levee reconstruction including replacement of unsuitable materials with import materials, as required, to re-establish the levee as-built geometry; 5. Installation and anchoring of chain link fabric along the finished surface of the levee slopes; 6. Placement of topsoil over chain link fabric mesh; 7. Traffic control; 8. Establishment of construction staging area(s); 9. Three (3)-year chain link fabric mesh, topsoil and turf maintenance of hydroseed establishment period; 10. Winterization of the proposed levee construction reach for early termination of work; 11. Installation of erosion control mat and hydroseeding after completion of levee reconstruction and placement of chain link fabric mesh; 12. Coordination of Trail closure activities with the City of San Jose and other adjacent property owners; 13. Repair any facilities including but not limited to trail access surface to its original condition due to any contractor operations; and 14. Other miscellaneous construction activities and items necessary to satisfactorily complete the Work. Time limit for the completion of the Work is 1220 calendar days. Questions deadline date: 05/22/2-23, 5:00 pm to Owner. Bonds required. Prevailing wages.

Award

Roads / Highways

$2,524,725.00

Public - City

Renovation

30

34

6

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
78
Bidding Soon
1,490
All Active Projects
628
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 31, 2023

img_map_placeholder

To Be Determined, San Jose, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.